Earthworks Contractors Since 1987

Earthworks That Hold Water.

Farm reservoirs, lakes, flood banks and bulk earthworks, built by the Whitnell family with our own GPS-guided machines and operators. Over 90 reservoirs, lakes and lagoons so far, and no complaints yet.

Rather talk it through? Call 01206 272834

  • 90+Reservoirs, lakes and lagoons built
  • 320,000 m³Water storage built for Trinity College
  • 1987Family run, now father and son
  • 4.6Google rating for Whitnell Plant
Whitnell’s Cat 330 excavator, with WHITNELL painted on the boom, and the Liebherr PR 736 dozer silhouetted against a pink and gold sunset
Our Cat 330 and Liebherr PR 736 on Site

Trusted By

  • Trinity College, Cambridge
  • Reservoir Safety Services
  • Hawes Associates
  • Suffolk Wildlife Trust
  • Boskalis
  • Amicus
  • Sirius Group
  • Prime Irrigation
  • Bentwaters Parks
  • David Williams Golf Design
  • ACS Midlands

What We Build

From the First Strip to the Final Trim.

We price the job, bring our own machines and operators, and build it to your engineer’s levels. Most of our work holds water. If it means moving a lot of ground accurately, it’s our kind of job.

Farm Reservoirs and Lagoons

Lined or clay irrigation reservoirs, built with balanced cut and fill so the spoil stays on the farm. We work to your engineer’s design and keep the topsoil for the banks.

Over 90 reservoirs, lakes and lagoons, including 320,000 m³ of storage for Trinity College

Size Your Reservoir

Lakes and Ponds

Golf course lakes, amenity lakes and wildlife ponds, shaped to the levels and finished to sit naturally in the landscape.

Golf course lakes and ponds across the south east for David Williams Golf Design

See Our Work

Flood Banks, Sea Defences and Habitat

Intertidal flood banks on soft ground, rock armour placed by our operated excavators, and new islands for nesting and roosting birds.

Trimley Marshes bird island on the River Orwell, 2026

See the Island

Bulk Earthworks

Topsoil strips, cut and fill, reduced level digs and road box cuts, moved fast with motor scrapers and finished to level with GPS-guided dozers.

A 4 km road box cut near Thetford, plus 8,000 t of sub-base, in 4 weeks

Why Scrapers

Plant Hire

Dozers from 9 to 25 tonnes, excavators from 14 to 40 tonnes, Bell dump trucks, motor scrapers, rollers and tracked dumpers, on short or long-term hire.

Our own machines, meticulously maintained, with our experienced operators

Browse the Fleet

Planning a Reservoir in 2026

Store Winter Water. Keep Irrigating Through Dry Summers.

2026 is England’s third drought in five years, and East Anglia has had it worst. A reservoir you fill in winter, when rivers can spare the water, is the most dependable way to keep irrigating when summer abstraction is cut.

In Drought

Likely to Last Into 2027

The Environment Agency expects East Anglia may still be in drought next April, and summer irrigation from the Colne, the Stour and Brett, the Blackwater and the Chelmer has been restricted.

Source: Environment Agency, October 2026

£15m

Funding Is on the Way

Up to £15 million for new on-farm reservoirs was announced in August 2026. It isn’t open yet, so this winter is the time to get your designs, volumes and earthworks costs ready.

Source: GOV.UK, 14 August 2026

Prior Approval

Planning Is on Your Side

Many farm reservoirs can go ahead under agricultural permitted development with prior approval from your council, if the dug soil stays on the farm. National policy now names on-farm reservoirs as development to support.

Source: Planning Practice Guidance and NPPF, August 2026

25,000 m³

Know Which Side of the Line

Hold 25,000 cubic metres or more above the surrounding ground and the Reservoirs Act 1975 applies, with Environment Agency registration and a panel engineer. Our planner shows where you stand.

Source: GOV.UK reservoir guidance

Farming near the Stour or the Suffolk coast? Read the 2026 guide to planning farm reservoirs in the Suffolk and Essex National Landscapes, written with Cranfield University. It covers design, permissions and fitting a reservoir into the landscape.

Open the Guide (PDF)

Reservoir Planner

How Big Does Your Reservoir Need to Be?

Tell us how much water you need and how deep you’d like to go. We’ll sketch the reservoir, the land it takes and the earth it moves, using the rectangular, balanced cut-and-fill layout most farm reservoirs follow.

Water to Store

That’s 63,600 m³, about the size of the 14 million gallon lined reservoir we built at Wantisden Hall Farms.

Water Depth
5.0 m

Shape
Outer Banks
Lining
How the Sketch Is Worked Out
  • A rectangular basin on a level field, with inside slopes of 1 in 3, a 4 m crest and 1 m of freeboard above the water.
  • Balanced cut and fill: the floor is dug just deep enough for the dug soil to build the banks, so the spoil stays on the farm.
  • 30 cm of topsoil stripped from the whole footprint, stored and spread back on the outer banks.
  • Scraper loads at about 15 m³ each, our figure for a Cat 621.
  • Your engineer sets the real slopes, crest, freeboard and lining after a site investigation.
Cross-section of the planned reservoir: 63,600 cubic metres at 5.0 m deep, dug 2.5 m below the field with banks 3.5 m high, 162 m across the banks162 m across the banks5.0 m deep2.5 m dug3.5 m bankCompacted bank, topsoil back on top4 m crest, 1.0 m freeboardLiner on the floor and slopesField levelHeights drawn 8× taller than widths
Cross-section of the planned reservoir: 63,600 cubic metres at 5.0 m deep, dug 2.5 m below the field with banks 3.5 m high, 162 m across the banks162 m across the banks5.0 m deepHeights drawn 11× taller than widths
Water Stored
63,600 m³14.0 million gallons
Land Taken
2.6 ha6.5 acres inside the banks
Size
162 × 162 macross the banks, 127 × 127 m of water
Bank Height
3.5 mabove the field, with the floor dug 2.5 m below it
Earth Moved
27,800 m³about 1,850 scraper loads, all kept on the farm
Topsoil Kept
7,900 m³stripped, stored and spread back on the banks

The Reservoirs Act 1975 Would Apply

About 35,900 m³ would sit above the surrounding ground, over the 25,000 m³ line for a large raised reservoir in England. You’d register it with the Environment Agency and build it under a panel engineer, and we work alongside yours. Or dig deeper and keep the water below ground, with the spare soil landscaped on the farm. GOV.UK guidance

Send This Sketch to Whitnell Talk It Through

A first sketch to start the conversation, not a design. Soils, groundwater, access, your licence and the law all shape the final reservoir, and on larger schemes a panel engineer sets the design.

How We Build a Reservoir

From Field to Full in Six Stages.

A reservoir is an engineered earth structure, not just a hole in a field. Here’s how ours go together, with the machines that do each job.

  1. Cross-section, stage 1: Set out to the design

    Stage 1

    Set Out to the Design

    Your engineer’s levels go into our Trimble GPS machine control, so the design is in the machines before the first bucket goes in.

    Trimble GPS on Our Dozers and Excavators

  2. Cross-section, stage 2: Topsoil stripped and stored

    Stage 2

    Strip and Store the Topsoil

    Topsoil comes off the whole footprint first and is stored separately, ready to go back on the outer banks.

    Motor Scrapers and Dozers

  3. Cross-section, stage 3: Dug soil building the banks

    Stage 3

    Dig and Build the Banks

    The dug clay goes straight into the banks in balanced cut and fill, so nothing has to leave the farm.

    Scrapers, Excavators and Bell 30 t Dump Trucks

  4. Cross-section, stage 4: Banks compacted in layers

    Stage 4

    Compact Layer by Layer

    Every layer of the bank is compacted as it rises, at the right moisture, so the banks stay sound for decades.

    16 t Dynapac Padfoot Roller

  5. Cross-section, stage 5: Floor and slopes trimmed and lined

    Stage 5

    Trim to Level, Ready to Line

    GPS-guided dozers trim the floor and slopes to the design, ready for the liner or the clay seal.

    Cat and Liebherr Dozers with GPS

  6. Cross-section of the planned reservoir: 63,600 cubic metres at 5.0 m deep, dug 2.5 m below the field with banks 3.5 m high, 162 m across the banks

    Stage 6

    Topsoil Back, Ready to Fill

    Topsoil goes back on the outer banks for seeding, and the reservoir is ready for its first winter fill.

    Dozers and Excavators

Heydon Reservoir, 2026

The earthworks were finished in just over 26 days.

A Whitnell Cat excavator loading a Bell articulated dump truck on the Heydon reservoir site
Digging and Loading the Bell Dump Trucks
A 16 tonne Dynapac padfoot roller compacting a layer of the reservoir bank at Heydon
Compacting the Bank with the Padfoot Roller
The finished crest and inner slope of the Heydon reservoir with the liner laid, machines working at the far end
Crest Trimmed and the Liner Laid
A newly lined irrigation reservoir at Heydon starting to fill, the black liner reflecting the clouds, with tyres holding the liner edge on the bank
Lined and Starting to Fill
Two Cat D6T dozers and a Cat 621E motor scraper lined up on a field near Thetford
Cat 621E Scraper and D6T Dozers Near Thetford
Three of Whitnell’s Caterpillar motor scrapers, numbered 3, 2 and 1, parked side by side in a field
Three of Our Cat Motor Scrapers

Motor Scrapers

The Machines Most Sites Have Never Seen.

A motor scraper cuts, carries and spreads in one machine. On big topsoil strips and cut-and-fill jobs, that means fewer machines, fewer drivers and fewer days than diggers and dump trucks.

Ours are Cat 621s, each carrying about 15 cubic metres a load, and all available with GPS. Some date from 1991 and have been refurbished to a high standard, and they still earn their keep on jobs from Suffolk to Salisbury.

“When we put them to work the guys were standing around watching them, videoing and taking photos for hours with amazement.”

ACS Midlands, on our scrapers at Wantage
4 kmRoad box cut near Thetford, plus 8,000 t of sub-base, in 4 weeks
15 m³Carried in each scraper load, then spread in thin layers

Earthmovers Magazine named Lionel Whitnell among the “earthmoving legends” who led the way in bringing motor scrapers back to UK sites. Read the article

Plant Hire

Our Machines. Our Operators.

Every machine here is ours, meticulously maintained and available on short or long-term hire, or as part of a contract. Add the ones you need and we’ll come back to you with availability.

Whitnell’s Liebherr PR 736 dozer pushing soil on a reservoir bank

Dozers

Every dozer runs Trimble GPS or a 2D laser, so slopes and floors are trimmed to the design first time.

  • Liebherr PR 73625 t5 or 3 Tyne RipperLow Ground Pressure TracksPower Angle Tilt BladeDouble Fold-in BladeTrimble Earthworks GPS360 Camera
  • Cat D6T25 t3 Tyne RipperLow Ground Pressure TracksTrimble GPS2D Laser
  • Cat D6N20 t3 Tyne RipperLow Ground Pressure TracksPower Angle Tilt BladeTrimble GPS2D Laser360 Camera
  • Cat D6K14 t3 Tyne RipperPower Angle Tilt BladeTrimble GPS2D Laser360 Camera
  • Cat D5K10 t3 Tyne RipperLow Ground Pressure TracksPower Angle Tilt BladeTrimble GPS2D Laser
  • Cat D4K9 tLow Ground Pressure TracksPower Angle Tilt BladeTrimble GPS2D Laser
A Whitnell Cat 336 excavator digging, with WHITNELL along the boom

Excavators

Steel-tracked excavators from 14 to 40 tonnes, GPS ready, with the attachments to suit the job.

  • Cat 336 LXE40 tSteel TracksGPS Ready
  • Cat 33030 tSteel TracksTrimble Earthworks GPS
  • Case CX210C21 tSteel TracksGPS Ready
  • Cat 313F14 tSteel TracksSlew and Height RestrictorGPS Ready
A Whitnell Bell B30E articulated dump truck in the yard

Dump Trucks

Four Bell 30 tonne articulated dump trucks, plus the Volvo that has been with us for many years.

  • Bell B30E30 t4 AvailableArticulatedTailgateWide Tyres
  • Volvo A25C25 tArticulatedOptional TailgateOur ‘Old Girl’
Two Whitnell Caterpillar motor scrapers, numbered 3 and 2

Motor Scrapers

Ideal for mass topsoil strips and cut and fill, moving huge amounts of soil in a short time.

  • Cat 621 Motor Scrapers15 m³Several AvailableGPS AvailableLoads, Carries and Spreads
Whitnell’s Hamm self-propelled padfoot roller

Rollers

Self-propelled and tow-behind rollers for compacting banks, formations and haul roads.

  • Dynapac Padfoot Roller16 tSelf-PropelledPadfoot
  • Hamm Roller7 to 8 tSelf-PropelledPadfoot
  • Bomag Roller6 tTow BehindSmooth Drum
  • Bomag Roller6 tTow BehindPadfoot
A yellow Komatsu tracked dumper with WHITNELL and the office number on its side

Tracked Dumpers

Rubber-tracked dumpers that keep working on soft ground, whatever the weather.

  • Takeuchi Tracked Dumper5 t180° SwivelRubber Tracks
  • Komatsu Tracked Dumper3 t360° SwivelRubber Tracks
A Whitnell Cat excavator fitted with a rock grab, lifting a boulder (photo: Jeff Welch Photography)

Attachments

Available with our excavators, in a range of sizes.

  • Rock GrabsRock ArmourSea Defences
  • Hydraulic BreakersConcrete and Rock
  • Tilt Buckets and V-BucketsDitches and Batters
  • Riddle and Allu Screening BucketsScreening on Site
  • Reed Cutting BucketsDitch and Lake Margins
  • Pole Grabs, Pallet Forks and Vibrating PlatesHandling and Compaction

Your hire list is empty. Tap Add on any machine, or just tell us the job and we’ll match the machine to it.

Ask About Hire

Recent Work

Reservoirs, Roads, Sea Walls and an Island.

A newly lined irrigation reservoir at Heydon starting to fill, the black liner reflecting the clouds, with tyres holding the liner edge on the bank

2026 Farm Reservoir

Heydon Reservoir

Earthworks finished in just over 26 days, using our Trimble earthworks GPS on a 30 tonne excavator and our Liebherr dozer, with two Bell 30 tonne dump trucks and a 16 tonne Dynapac padfoot roller.

Lined Reservoir26 DaysTrimble GPS

Aerial view of the new bird island at Trimley Marshes on the River Orwell, with lagoons, grazing marsh and fields behind (photo: Jeff Welch Photography)Photo: Jeff Welch

2026 Habitat Creation

Trimley Marshes Bird Island

A new island for nesting and roosting birds on the River Orwell, built from local dredgings for Suffolk Wildlife Trust, with funding from Harwich Haven Authority, working for contractors Amicus and Boskalis.

Dredged MaterialSoft Ground

2016 Two Farm Reservoirs

320,000 m³

Trinity College, Cambridge

Two reservoirs on Searson’s and Candlet’s farms, built for Reservoir Safety Services: 230,000 m³ of topsoil strip, clay excavation and compaction. Earthmovers Magazine called it one of the largest agricultural water storage projects ever undertaken in East Anglia. Read the report

320,000 m³ of Storage10.5 ha Combined

A Cat D6T dozer pushing a Cat 621E motor scraper as it loads, on a grass field edged with Scots pines near Thetford

2022 to 2023 Bulk Earthworks

Access Road Near Thetford

Reduced level excavation for a 4 km by 5 m road box cut with our Cat 621E motor scraper and D6T dozer, then 8,000 t of granular fill and geotextile, all completed in 4 weeks.

4 km Box Cut8,000 t Sub-Base4 Weeks

A Whitnell Cat excavator with a rock grab placing granite rock armour on the beach at Felixstowe (photo: Jeff Welch Photography)Photo: Jeff Welch

2023 Sea Defences

Felixstowe Sea Defence Works

Our operated Cat 330 and Cat 336 excavators with rock grab attachments, placing rock armour at Felixstowe.

Operated HireRock Armour

Your Project

Planning Something Similar?

Send us your drawings or a rough idea of the volumes and we’ll price it, or come and look at the site with you.

Get a Quote 01206 272834

What Our Clients Say

On Time, on Budget and Left Tidy.

“On each of the projects Whitnell’s competence has never been in question. All the projects have been completed on time, when the weather allows, and to budget. The quality of the work and the plant provided has been excellent and the GPS 3D ground model control has been extremely helpful.”

Hawes AssociatesEngineers on six of our reservoir and intertidal flood bank contracts

“The onsite management, operator competence have been second to none and with the site being left in such tidy order I would have no hesitation in recommending you and your company to anyone undertaking large scale engineering projects.”

Bentwaters ParksOn a 14 million gallon lined reservoir at Wantisden Hall Farms

“Their communication throughout the builds with all those involved, has been excellent and the finished reservoirs have been built to specification in a very tidy and efficient manner.”

Prime IrrigationOn two irrigation reservoirs on Suffolk farms

“I have always found Whitnells to be extremely thorough and diligent in all aspects of the contract, leading to very many successful projects built on budget and on programme.”

David Williams Golf DesignOn golf course lakes and ponds over 15 years
4.6

Rated 4.6 on Google, where one reviewer says Lionel Whitnell is “a pleasure, well worth using”.

Read the Reviews
Lionel and Matt Whitnell in hi-vis beside the black and gold Liebherr PR 736 dozer, with the lion and WHITNELL on its side
Lionel and Matt Whitnell with Our Liebherr PR 736, the Lion on Its Side

About Whitnell

Three Generations. One Name on the Boom.

Whitnell has been family run since 1987, with three generations of the family at the helm. Lionel Whitnell, who has more than 50 years in earthmoving, runs the business with his son Matt.

Lionel started out with one machine. Matt joined the family firm at 16 and is our dozer specialist, out on site running the jobs he’s on. We’ve grown by investing in modern machines and technology and looking after them, and by doing what clients keep coming back for: turning up with the right kit and people, keeping everyone informed, finishing on programme and leaving the site tidy.

The black and gold Liebherr PR 736 in the photo made its debut with us on a land remediation job near Ipswich. We run the business from School Farm in Langham, just north of Colchester, and work across East Anglia and the rest of the UK.

1987The year the business began
50+Years Lionel has spent moving earth
16Matt’s age when he joined in 1996

FAQs

Straight Answers Before You Dig.

Planning, permissions, liners, timing and hire. If your question isn’t here, call us: you’ll speak to someone who knows the machines.

01206 272834
Do I Need Planning Permission for a Farm Reservoir?

Often not full planning permission. Many farm reservoirs can be built under agricultural permitted development rights on holdings of 5 hectares or more, as long as the dug material stays on the farm, but you still need prior approval from your council before work starts.

Bigger schemes, or sites in sensitive places such as National Landscapes, may need full planning permission and sometimes an environmental assessment. National planning policy now names on-farm reservoirs as development councils should support. GOV.UK planning guidance

Will My Reservoir Come Under the Reservoirs Act?

In England, a reservoir that can hold 25,000 cubic metres or more above the surrounding ground is a large raised reservoir under the Reservoirs Act 1975. It must be registered with the Environment Agency and designed and built under a panel engineer. We work alongside your panel engineer from the first strip to the final sign-off.

The limit may fall to 10,000 cubic metres, as it already has in Wales, so it pays to plan for that now. Our planner shows roughly how much of your water would sit above ground.

Do I Need an Abstraction Licence to Fill It?

Usually, yes. Taking more than 20 cubic metres a day from a river, stream or borehole needs an Environment Agency licence, and filling in winter, when rivers can spare the water, is the usual route. A reservoir filled only with rainwater from roofs and hard surfaces doesn’t need one.

Talk to the Environment Agency early: in water-stressed catchments licences can take months and may be limited. GOV.UK abstraction guidance

Lined or Clay: Which Is Better?

It depends on your ground. A clay reservoir needs enough suitable clay on site and is long-lasting. Where the soil won’t hold water, a membrane liner does the job, but lined reservoirs need secure fencing and escape ladders, and liners typically last around 25 years.

We build both, and a site investigation tells you which suits your field. The 2026 Suffolk and Essex reservoir guide sets out the trade-offs well.

What Does a Farm Reservoir Cost?

Every site is different, so we price from your drawings. As a guide, the 2026 Suffolk and Essex reservoir guide found that across 30 recently built reservoirs, clay-lined ones typically cost £2 to £3 per cubic metre of storage for the earthworks, and membrane-lined ones £2.50 to £4.50 including the liner.

Those figures leave out fees, site investigation, pumps, pipework and power, and larger reservoirs cost less per cubic metre than small ones.

How Long Does a Reservoir Take to Build?

It depends on size, soil and weather. At Heydon in 2026 the earthworks were finished in just over 26 days. Summer is the best time to build, because soil compacts best when it’s dry, so plan over the winter for a summer start.

Do You Hire Machines with Operators?

Yes. Our machines go out with our own experienced operators, on short or long-term hire, or as part of a contract where we price the whole job. Call the office to talk through what you need and when.

Can You Work to My Engineer’s Design and GPS Model?

Yes. Our dozers run Trimble GPS or laser, and the engineers we work with tell us the GPS 3D ground model control has been extremely helpful. Send us the model and drawings and we’ll price to them.

How Far Do You Travel?

Our yard is at Langham, just north of Colchester, and most of our work is across Essex, Suffolk, Norfolk and Cambridgeshire. We work throughout the UK, from reservoirs in Suffolk to earthworks at Wantage and Salisbury.

Get a Quote

Tell Us About the Job.

Send a few details and we’ll call you back to talk it through. If you’ve used the planner or picked machines, they come with your message.

01206 272834Office and hire desk info@whitnell.co.ukDrawings and enquiries
School Farm Buildings
School Road, Langham
Colchester, Essex
CO4 5PBDirections to the Yard
The Whitnell office at School Farm, Langham: a black weatherboarded building with the gold lion sign reading Plant Hire and Earth Moving Contractors

Request a Quote or Call Back

Three quick fields, then anything else you’d like to tell us.

What do you need? (tick any)

We reply to every enquiry. In a hurry? Call 01206 272834.