Chartered surveyors, architects and engineers, London, since 2010

Building Safety, Under One Roof.

Cladding remediation, PAS 9980 assessments, EWS1 forms and fire compliance for housing providers and building owners in London and the South East. One director-led team, from first investigation to sign-off.

Or call 020 3653 0900

180 Stratford High Street: a curved glass residential tower with lower blocks either side, after its ACM and EWI cladding replacement
180 Stratford High StreetACM and EWI cladding replacement on three blocks for Savills, completed May 2022
  • Over 200medium- and high-rise building projects for public and private sector clients
  • 36 high-risebuildings given Building Safety Case reports for Enfield Council, 2023 to 2024
  • LHC MDC1framework place, January 2022 to January 2028

Clients include

  • Royal Borough of Kensington & Chelsea
  • London & Quadrant Housing Trust
  • London Borough of Camden
  • London Borough of Enfield
  • London Borough of Haringey
  • Savills
  • Get Living
  • Stonewater
  • Barnet Homes
  • Orbit Housing

Building safety

Four Services, One Accountable Team

One team of investigators, building surveyors, architects, engineers and cost consultants, with chartered fire engineering input, stays with your building from the first opening up to sign-off.

  1. Cladding Remediation

    Investigation, design, specification, management and monitoring, by a dedicated in-house team.

    • Intrusive investigations, material testing and option appraisals
    • Building Safety Fund and Cladding Safety Scheme applications
    • Design, Section 20 consultation, tendering and contract administration
    • Client-side monitoring under the Developers’ Pledge
    Cladding remediation in detail
  2. PAS 9980 Assessments and EWS1 Forms

    Chartered surveyors, chartered fire engineering input and our own builders’ works team, managed as a single point of responsibility.

    • Desktop review of the fire strategy and health and safety files
    • Opening up and reinstatement by our own builders’ works team
    • Site investigation report and PAS 9980 assessment
    • EWS1 form completion
    PAS 9980 and EWS1 in detail
  3. Fire Compliance

    Every fire compliance project is overseen by senior directors, from strategy and inspection to installation.

    • Fire risk assessments and compartmentation surveys
    • Fire strategies, means of escape and smoke control reviews
    • Retrofit sprinkler feasibility, design and specification
    • Premises Information Box layouts and drawings
    Fire compliance in detail
  4. Building Safety Act

    Building Safety Case reports, structural safety reports and Gateway submissions for higher-risk buildings.

    • Building Safety Case reports, shaped with your team in workshops
    • Structural safety reports and structural surveys
    • Gateway 1, 2 and 3 submissions on remediation schemes
    • Measured surveys, floor plans and elevation drawings
    Building Safety Act work in detail

Our road map

Five Stages, From First Survey to EWS1

Our cladding remediation road map keeps compliance, quality and cost control in view at every stage, from the first data request to the EWS1 form at completion.

  1. Stage 01

    Identification

    We gather what is already known about the building before anyone opens up a wall.

    • Data collection
    • Existing EWS1 forms
    • Fire risk assessment
    • Health and safety file
  2. Stage 02

    Assessment

    Our investigation team opens up the walls, tests the materials and appraises the options.

    • Intrusive investigations
    • Material testing
    • PAS 9980 assessment
    • Option appraisal report
  3. Stage 03

    Procurement Approach

    We recommend the route that fits your governance and your programme.

    • Two-stage design and build
    • Traditional tendering
    • Negotiation
    • Frameworks
  4. Stage 04

    Design Solution

    A competent design team develops the solution and takes it through statutory approval.

    • Competent design team
    • Design development and sign-off
    • Statutory approvals
  5. Stage 05

    Construction

    We manage the works on site, with agreed quality checks, statutory sign-off and the EWS1 form at completion.

    • Agreed QA procedures
    • Statutory sign-off
    • Project monitoring
    • EWS1 form
Discuss Your Project

Joining part-way? At Adair and Hazlewood and at Elephant Central we began with a peer review of the work already done.

Selected projects

Building Safety Work, Block by Block

From an investigation on Trellick Tower’s 23rd floor to Building Safety Case reports for 36 high-rise buildings, a selection of our work for councils, housing associations and private owners.

One of the Adair and Hazlewood towers in North Kensington, with construction hoists up its face during the re-cladding works

Royal Borough of Kensington & Chelsea

Adair and Hazlewood

Re-cladding two towers with an A1 non-combustible system: the first cladding schemes the Royal Borough undertook after the Grenfell tragedy.

Value
Circa £7m
Dates
April 2019 to February 2023
Our role
Lead designer, architect, employer’s agent, project manager, structural engineer and cost consultant
Read the case study
Trellick Tower in West London seen from below against a blue sky

Royal Borough of Kensington & Chelsea

Trellick Tower A

An intrusive investigation of the timber cladding in the dual-height balconies, worked from a 23rd-floor balcony, for a PAS 9980 FRAEW and EWS1 form.

Date
October 2022
Our role
Preliminary assessment, builders’ works, investigation report and fire engineer input for the FRAEW and EWS1
Read the case study
Exeter House in Dagenham: a ten-storey block with a green and white chequered facade and balconies

London & Quadrant Housing Trust

Exeter House

Combustible HPL cladding replaced on a ten-storey block in Dagenham, with every stage of the Building Safety Fund application managed.

Value
£2.4m
Dates
September 2020 to May 2023
Our role
Employer’s agent, cost consultant, project manager, engineers, architects and clerk of works
Read the case study

More From Our Project Register

  1. 180 Stratford High Street

    Client: Savills, on behalf of Aberdeen UK Property Fund

    Work: ACM and EWI cladding replacement on three blocks, £7.9m

    Dates: October 2019 to May 2022

  2. Building Safety Case reports

    Client: London Borough of Enfield

    Work: Reports for all 36 of its high-rise residential buildings, through the LHC framework

    Dates: October 2023 to April 2024

  3. Birkenhead Estate

    Client: London Borough of Camden

    Work: Cladding Safety Scheme funded remediation of four seven-storey blocks

    Dates: October 2024 to October 2026

  4. Intrusive investigations and FRAEWs

    Client: London Borough of Haringey

    Work: Investigations and PAS 9980 FRAEWs across high-, medium- and low-rise blocks

    Dates: A three-year programme

  5. Building Safety Case reports

    Client: Stonewater

    Work: Four high-rise buildings in Southampton, Poole and Bracknell, through the LHC framework

    Dates: August 2023 to April 2024

  6. Elephant Central

    Client: Get Living

    Work: Cladding and balcony decking replacement on three blocks, Gateway 1 to 3

    Dates: August 2024 to August 2026 (estimated)

  7. Lancaster West Estate, Lot 1

    Client: Lancaster West Neighbourhood Team, for RBKC

    Work: External works and roofing, £93m

    Dates: Planned completion 2029

  8. Dairy Close

    Client: London & Quadrant

    Work: ACM cladding replacement on five blocks in Parsons Green, £2.1m

    Dates: From October 2017

All our projects

In our clients’ words

What Councils, Landlords and Their Advisers Say

It was Capital’s meticulous attention to detail and first-class contract management that made the Dairy Close project a notable success, not only in terms of fire safety, but also in achieving superb quality and value for money on the project. We know we are in safe hands with Capital with projects of this nature.

Gary LeaProject Manager, London & Quadrant Housing Trust

I am pleased to report Capital PCC proved very capable of meeting the deadlines. Capital PCC delivered all the agreed services within the pre-agreed time and budget allocations.

Sean GallagherProgramme Director BSA, Enfield CouncilOn our Building Safety Case reports for its high-rise buildings

Our cladding consultant was seriously impressed by the quality of work, skill of the team and the level of documentation. It’s really impressive.

Tony DefriesDirector Building & Project Consultancy, Savills
More testimonials

Our disciplines

Every Discipline Your Project Needs

Behind our building safety work is a full multidisciplinary practice, also appointed on its own for refurbishment, new build and education projects.

  • Project Management

    Project management and employer’s agent services, from developing the brief to contract administration.

  • Cost Consultancy

    Cost planning, tendering, change control and final accounts, led by MRICS-qualified professionals.

  • Building Surveying

    Defects, dilapidations, schedules of condition, specifications and contract administration.

  • Structural Engineering

    Investigation and diagnosis of building failure, Large Panel System appraisals and structural design.

  • Architecture

    RIBA Stages 0 to 7, from feasibility and planning to façade remediation design.

Who We Work For

  • Public sectorLocal authorities, ALMOs, registered social landlords and housing associations, through public sector frameworks.
  • Private sectorFreeholders, managing agents, developers and investors, with senior management overseeing every instruction.
  • EducationMulti-academy trusts, independent schools and universities, from asset surveys to campus transformation.

For procurement teams

How to Appoint Us

Appoint us directly or through a public sector framework. We are happy to use our own appointment documents or to agree yours.

Discuss Your Project Frameworks and how to appoint

LHC

Multi-Disciplinary Consultancy Services Framework (MDC1)

11 January 2022 to 10 January 2028. Call-offs agreed before then can run beyond it. Enfield Council and Stonewater appointed us through LHC for their Building Safety Case reports.

Bloom

NEPRO Neutral Vendor Solution

We are an accredited Bloom supplier. Buyers can direct award or run a mini-competition.

CHIC

Fire Safety Framework

A listed supplier, supporting housing providers with compliant fire safety programmes.

Panels and client frameworks

  • June 2022Won a place on Notting Hill Genesis’s Fire Consultants framework, Lot 1b: surveys, remedial advice, inspections and resident engagement.
  • February 2023Appointed to the Homes England Medium Rise Scheme Fire Risk Assessor Panel.

About Capital

Director-Led Since 2010

Capital was co-founded by Patrick Madigan and Richard O’Reilly and originally established to serve North London boroughs. Since 2010 we have built strong links with social landlords, schools, academies, universities, commercial owners and developers.

Our core values are honesty, integrity and approachability.

Project awards include Innovation Roof of the Year at the NFRC UK Roofing Awards 2019, for Turkey Street in Enfield, and Large Scale Project of the Year at the 2016 Greater London Regional Energy Efficiency & Retrofit Awards, for the Exeter Road retrofit.

  • Patrick Madigan

    Patrick Madigan

    Managing Director

    BSc (Hons) MRICS

    Building surveyor, project manager and director in housing for over 28 years.

  • Richard O'Reilly

    Richard O’Reilly

    Managing Director

    MRICS MFPWS RMaPS

    Project management and procurement, now heavily involved in cladding remediation.

  • Michael Scullion

    Michael Scullion

    Principal Architect

    BArch, Dip Arch, PG Cert DAR

    Chartered architect with over 20 years in technical design and façade remediation.

  • Anthony Michaelides

    Anthony Michaelides

    Director of Building Surveying

    BSc (Hons) MRICS

    Chartered building surveyor with over 15 years in façade remediation and fire safety upgrades.

  • Sean Griffin

    Sean Griffin

    Director of Quantity Surveying

    MRICS

    Chartered quantity surveyor on cladding remediation and building safety projects.

  • Dannan O'Meachair

    Dannan O’Meachair

    Chief Operations Officer

    Over 10 years in operational management and business growth.

Before you call

Questions We Are Often Asked

Straight answers on assessments, EWS1 forms, funding and appointing us. For anything else, call 020 3653 0900.

Do we need an FRAEW, or is a fire risk assessment enough?

Every residential building with two or more flats needs a fire risk assessment under the Fire Safety Order. Where that assessment recommends it, a specialist carries out a fire risk appraisal of the external walls (FRAEW) using PAS 9980, as GOV.UK’s guidance of September 2026 explains. We arrange the opening up with our own builders’ works and investigation team, write the site investigation report and the PAS 9980 assessment, and bring in chartered fire engineering input where appropriate.

Is an EWS1 form a safety certificate?

No. GOV.UK’s guidance (September 2026) says an EWS1 form is not a government or regulatory document and is not a safety certificate. Mortgage lenders and valuers may ask for one when a flat is sold or remortgaged, and it does not replace an FRAEW. We complete EWS1 forms as part of our PAS 9980 work.

Can you help us apply for remediation funding?

Yes. We have managed Building Safety Fund applications for schemes such as Exeter House for London & Quadrant, and our costed designs secured Cladding Safety Scheme funding for four blocks on Camden’s Birkenhead Estate. One rule to know first: the Cladding Safety Scheme only accepts FRAEWs from firms on Homes England’s own assessor panel, which applicants can see once they have submitted their initial application.

Which frameworks can we appoint you through?

LHC’s Multi-Disciplinary Consultancy Services framework (MDC1), which runs from 11 January 2022 to 10 January 2028, Bloom’s NEPRO neutral vendor route and the CHIC Fire Safety Framework. We also take direct appointments, on our own appointment documents or yours.

Who will run our project?

A director-led team. Our cladding remediation work is led by director-level project managers and every fire compliance project is overseen by senior directors, with the surveyors, architects, engineers and cost consultants you need on the same team.

Where do you work?

From our offices in North Finchley and Eversholt Street, NW1, we work for local authorities, ALMOs, registered social landlords and housing associations in London and the South East, and for private owners and managing agents. Our Building Safety Case reports for Stonewater covered high-rise buildings in Southampton, Poole and Bracknell.

Project enquiry

Discuss Your Project

Tell us about the building or project and the help you need, and a member of our team will be in touch.

Send a Project Enquiry

We will use your details to reply to your enquiry. Our privacy policy explains how we handle them.

North Finchley

Solar House, 915 High Road
London N12 8QJ

Map

Eversholt Street

Mainframe, 2nd Floor, Office 2.10
24 Eversholt Street
London NW1 1AD

Map