Asphalt Plant Engineers Since 1988

Asphalt Plant Engineering, From Cold Feed to Loadout.

We design, build, install and refurbish asphalt and aggregate processing plant, from a single dryer drum to a complete mobile plant. And when something wears, the genuine parts are already on our shelves in Suffolk.

A green BG Europa soil stabilisation plant and a white DA60 relocatable silo, seen from below against a cloudy sky
Built by BG Europa: a KS soil stabilisation plant with a DA60 relocatable silo.
  • 1988Formed from Barber Greene England
  • BespokeEngineered in-house to your site and materials
  • WorldwidePlant at work from Ireland to Bahrain and Trinidad
  • 600 m² StoresGenuine spare parts for immediate dispatch

What We Do

Three Ways We Keep Your Plant Earning

A new plant, an upgrade that has to fit inside a shutdown, or a part you needed yesterday: you deal directly with the engineers who design it.

New Plant and Upgrades

Dryers, filters, mixers, feeders, elevators, silos and complete mobile plants, engineered to your site, your materials and your output.

  • Bespoke to your plant and layout
  • Recycling, hot storage and emission upgrades
  • Design, fabrication, installation and commissioning, managed by us
Discuss a Project

Refurbishment and Shutdown Work

Drum shells and flights, pulse-jet filter sections, screens, pugmills and storage extensions, prepared in our workshop so the work on site fits your shutdown.

  • Drum shells and pulse-jet filters that retrofit to any asphalt plant
  • Pre-assembled and tested before they leave
  • Installation planned around your shutdown dates
Plan Shutdown Work

Genuine Spare Parts

Barber Greene, Astec and FMA Ullrich parts, and parts for the plant we build, held in our stores in Suffolk.

  • Two machine sets of Barber Greene wearing parts
  • Pallet, parcel and same-day courier dispatch
  • Close to Felixstowe and the London airports
Order Spare Parts

Explore the Plant

Every Stage of Your Plant, One Engineering Team

Pick a stage to see what we build, upgrade and stock for it. We design around the plant you already have, whoever made it.

Tap any part of the drawing, or use the stage buttons.

Stage 01 of 07

Cold Feed

Holds your aggregates and RAP, and meters them onto the gathering conveyor in the right proportions.

Three new green cold feed hoppers with belt feeders, finished and waiting in the yard

We Build and Supply

  • Cold aggregate feed units: stationary, relocatable or mobile
  • RAP bins and belt feeders made for sticky, poor-flowing material
  • Mobile RAP feeder: one towed unit, set up without foundations

Upgrades and Repairs

  • Weigh idlers to measure the feed rate
  • Scalping screens and heavy-duty grizzlies
  • Replaceable hopper liners and weather housings

Ronaldsway Airport, Isle of Man, 2011: our mobile RAP feeder worked alongside a mobile asphalt plant on night-time runway works, then moved on to the Falklands.

Ask About Cold Feed

Stage 02 of 07

Conveying

Carries aggregate from the cold feed up to the dryer, with a scalping screen to keep oversize out.

An inclined belt conveyor with a yellow-railed walkway and stairs running up to an asphalt plant

We Build and Supply

  • Belt conveyors designed for quick, simple installation
  • Inclined conveyors with in-line weighbridges
  • Lattice-framed and trestle-supported runs to suit the layout

Upgrades and Repairs

  • Walkways, handrails and kicking strips
  • Pull-wire switches along the full length
  • Hinged wind covers and belt scrapers

South west England, 2011: a RAP system with a 29.5 m lattice-framed conveyor and weigh conveyor on a Parker batch plant, commissioned within the allotted time.

Ask About Conveying

Stage 03 of 07

Drying

Dries and heats the aggregate. The drum sets much of your output and most of your fuel bill.

An SD 1.5 parallel-flow dryer drum on its steel chassis

We Build and Supply

  • Counterflow dryer drums for asphalt, in 10 to 20 mm boiler plate
  • SD parallel-flow dryers for sand, slag, glass and minerals
  • Retrofit drum shells that fit any asphalt plant

Upgrades and Repairs

  • New flight patterns, with insulation flights in the combustion zone
  • Forged trunnion rings, pivoting roller stools and underslung chain drives
  • Burners from several makers, to suit your fuel

Tarmac, Skipton Rock Quarry, 2011: drum refurbished in five days with new flights, trunnion rings, seals and wear bands. The quarry manager said it “helped us to reduce our energy costs”.

Ask About Drying

Stage 04 of 07

Filtration and Emissions

Cleans the exhaust air before it leaves the stack, and returns the collected fines to the mix.

A pulse-jet filter section fitted to an existing asphalt plant

We Build and Supply

  • SF pulse-jet fabric filters in a range of sizes
  • SFC compact filters that ship in one container
  • Mobile baghouses on their own chassis
  • Exhaust fans, ducting and stacks

Upgrades and Repairs

  • Pulse-jet sections to replace corroded reverse-air filter tops
  • Converted over a weekend, with the bags already fitted
  • Dust conditioners for cleaner fines disposal

Aggregate Industries, Bardon Hill, 2015: a reverse-air filter replaced by our SF20/2 pulse-jet filter in the same footprint, with more exhaust and filtration capacity.

Ask About Filtration

Stage 05 of 07

Elevating

Lifts the hot, dried aggregate to the screen at the top of the tower.

A tall bucket elevator rising beside a dryer drum and filter house

We Build and Supply

  • Bucket elevators for new plant or as a retrofit
  • Hot elevators matched to the dryers and filters we supply
  • Static fines silos for filler

Upgrades and Repairs

  • Segmented sprockets you can change without removing the drive
  • Bolt-on buckets on heavy-duty chain
  • Replacement elevator sections, chain and buckets

Tarmac, Minffordd Quarry, 2008: a new section of hot stone elevator with chain and buckets, fitted alongside a new screen over the Easter shutdown.

Ask About Elevating

Stage 06 of 07

Screening and Mixing

Screens, weighs and mixes the aggregate with filler, bitumen and RAP.

The twin timing gears of a pugmill mixer inside its green drive housing

We Build and Supply

  • Pugmill mixers that drop into Barber Greene towers, often with more capacity
  • Replacement asphalt screens and screen housings
  • RAP addition systems for batch plants
  • Access platforms, walkways and handrails

Upgrades and Repairs

  • Ni-hard liners and reversible, replaceable paddle tips
  • Shaft-mounted pugmill gearboxes: more power without major structural work
  • Refurbished pugmill gearboxes and screen drive units

CEMEX, Salford, 2009: a five and a half deck screen for a Barber Greene BA2250 batch plant, installed ahead of schedule.

Ask About Mixing

Stage 07 of 07

Hot Storage and Loadout

Keeps finished mix hot, so you can load lorries fast, take small orders and cover nights and weekends.

A lorry being loaded with steaming hot asphalt under the new storage silo at Westleigh

We Build and Supply

  • Hot storage with skip hoists: inline, square cluster or horizontal silos
  • Extra bins added to existing storage
  • Loadcell or weighbridge loadout

Upgrades and Repairs

  • New skip winches and track for faster cycle times
  • Stainless or Hardox skip liners for sticky mixes
  • Blue smoke collection at loadout

Aggregate Industries, Westleigh, 2014: an FMA Ullrich S200/4, with 200 tonnes in four bins to one loading point, installed while the plant kept running.

Ask About Hot Storage

Projects

Plant We’ve Built, Fitted and Kept Running

For national producers, independents and contractors, in the UK and overseas. A few of the jobs behind the reputation:

A crane lifting a new 40 tonne drum mixer into the West Drayton asphalt plant

Aggregate Industries · West Drayton · Christmas 2010

A 40 Tonne Drum Mixer, Swapped Over Christmas

The dryer drum had reached the end of its economic life, and the plant needed to take more recycled asphalt without adding equipment. We designed and built a new 3.1 by 15 metre drum mixer shell with our own recycle breaching, trunnion rollers and an underslung chain drive.

The old drum came out the week before Christmas. A 200 tonne crane lifted the new one in over the bitumen tank farm, and the job was finished safely inside the time allowed, in some of the worst weather in years.

  • 15 mNew drum mixer shell, 3.1 m across
  • 200 tCrane, lifting over the bitumen tanks
  • 30%RAP at commissioning, up from 20%

“BG Europa offered us a solution that would provide an increase of recycled asphalt from 20 to 50 per cent.”

Phil Coupland, Area Operations Manager, Yeoman Asphalt, part of Aggregate Industries UK
The new SF20/2 pulse-jet fabric filter, stairway and exhaust stack at Bardon Hill

Aggregate Industries · Bardon Hill · 2015

A Bigger Filter in the Old One’s Footprint

Our SF20/2 pulse-jet filter replaced a reverse-air unit on a Standard Havens drum plant: more exhaust and filtration capacity, 1,438 m² of cloth, on the existing foundation fixings.

The new hot storage silo and skip track beside the asphalt plant at Westleigh, Devon

Aggregate Industries · Westleigh, Devon · 2014

Hot Storage Added While the Plant Kept Running

An FMA Ullrich S200/4, with 200 tonnes in four bins discharging to one loading point, added to a plant first installed in 1972. On time and in budget.

A new asphalt screen in its dust housing on the batch tower at Minffordd Quarry

Tarmac · Minffordd Quarry · Easter 2008

A New Screen, Lifted In Over Easter

Pre-assembled on its new base frame inside the dust housing in our workshop, then lifted into the Barber Greene batch tower in one piece.

A green stationary KS60 stabilisation plant with aggregate bins and a fines silo in Bahrain

Bahrain · 2004

Stabilising the Bahrain Grand Prix Circuit

A stationary KS60 stabilisation plant supplied to stabilise the sub-base for the new Grand Prix track.

“The overall service provided by BG Europa was extremely comprehensive and has helped us to reduce our energy costs. We would not hesitate in choosing them again.”

Martin DobsonQuarry Manager, Tarmac Skipton Rock Quarry, 2011

“BG Europa’s installation crew are to be applauded for their dedicated attitude to on site safety.”

Mick SpeedCluster Production Manager, Lafarge, Ackworth, 2009

“BG’s delivery of the plant on schedule was not compromised by their impressive flexibility of design in accommodating our specific requirements.”

Philip PoelsDirector, Anglia Lime Company, 2012

More From the Project Files

YearClient and SiteWhat We Did
2012Anglia Lime, SudburySD 0.8 parallel-flow dryer and SFC 20 pulse-jet filter, wired and tested in our workshop before delivery
2012National aggregate producerRAP systems on Gencor and Barber Greene batch plants: 20% RAP nominal, up to 25% at full capacity
2011Tarmac, Skipton Rock QuarryDryer drum refurbished in five days: new flights, trunnion rings, seals and wear bands
2011Ronaldsway Airport, Isle of ManMobile RAP feeder for night-time runway works, then on to the Falklands
2010O’Keefe, LondonBespoke relocatable KS55 to treat utility arisings that used to go to landfill
2010Tarmac, Bayston HillDryer drum taken out over Christmas, re-flighted in our workshop and back for the New Year
2009FCC Construction, N6 GalwayKS60 CBM plant, up to 550 t/h: 270,000 tonnes for the N6, erected in five days
2009Lafarge, AckworthFMA Ullrich S200/4 II hot storage, 200 tonnes in four bins, installed in a programmed shutdown
2009CEMEX, SalfordFive and a half deck screen for a Barber Greene BA2250 batch plant, fitted ahead of schedule
2008AG Thomas, SwazilandMobile SF4 pulse-jet fabric filter, sited without foundations, for road projects in Botswana
2007Tarmac, Eaton HallSD1.5 dryer for a bagged aggregates plant, 45 t/h, with burner, controls and hot elevator
2004Foster Yeoman, MicheldeverKSF55 foam mix plant producing Foamix at 200 tonnes an hour
2004Maputo to Xai-Xai road, MozambiqueKS50 mobile unit mixing sandy lean concrete for sub-base and base courses

Clients have included Aggregate Industries, Breedon, Brett Aggregates, CEMEX, Hanson, Tarmac, Lafarge, Anglia Lime, O’Keefe, Harsco, European Metal Recycling, Calumite, NCC Roads and Colas CZ.

Shutdown Work

Built Before Your Shutdown. Fitted Inside It.

Every day your plant stands idle is mix you can’t sell. So we do as much as we can before we arrive: design, fabrication, pre-assembly and testing. On site, we run the installation and commissioning, and leave the site clean.

  1. Survey and Design

    We survey the plant and design the work around it. For Barber Greene plant we still hold the original engineering files.

  2. Fabricate

    Drums, filters, screens, mixers and steelwork are fabricated in the UK to our designs.

  3. Pre-Assemble and Test

    Sections are built up and tested before they leave. Complete KS plants are run up in the workshop, and you’re welcome to inspect yours before delivery.

  4. Fit It Inside the Shutdown

    We plan and run the site work, often lifting a whole section in one go.

  5. Back It With Parts

    Spares for what we fit stay on our shelves in Suffolk.

A crane lifting a new dryer drum shell into place at an asphalt plant

Minffordd Quarry, Easter 2008

  1. Good FridayTower roof off
  2. Easter MondayNew screen lifted in
  3. WednesdayFull production

“A very professional and extremely well executed operation carried out safely and to a high standard.”

Malcolm Ellis, Quarry Manager, Tarmac Minffordd

A corroded reverse-air filter can be converted to pulse-jet over a weekend: the new sections arrive with their filter bags already fitted.

Planning Winter Shutdown Work?

Talk to us now, while there’s still time to design and build before your plant stands down.

Plan Shutdown Work

Recycled Asphalt

How Much RAP Can Your Plant Take?

Reclaimed asphalt is worth the virgin aggregate and bitumen it replaces, tonne for tonne. But the more you add, the more your plant has to do. Slide to see what each level takes.

  • 55%National Highways’ target for recycled content in asphalt concrete by 2035, up from 35% by 2025
  • 80%Its target for warm mix on the strategic road network by 2030
  • 23.5 MtAsphalt made in the UK in 2024, at 264 Mineral Products Association member plants

Sources: National Highways, net zero roadmap for concrete, steel and asphalt; MPA, Profile of the UK Mineral Products Industry 2025.

20%RAP in the mix, by weight

Up to 20%

Most Batch Plants Can Start Here

Cold RAP can go straight into the pugmill, where the superheated aggregate dries and heats it. The catch is steam: cold, wet RAP hitting hot aggregate makes a burst of it, so extraction matters.

  • A BG Europa RAP bin and feeder, made for sticky material
  • Static weigh belt, weigh pod or in-line belt weighing
  • Steam extraction ducting at the pugmill

20 to 30%

Drum Plants, With Tighter Gradation Control

A drum mix plant can take about 30% through a recycle breaching in the drum. From 20% up, split the RAP into the same sizes as your virgin aggregate, so gradation and binder content stay consistent.

  • A BG Europa drum recycle breaching
  • Separate RAP bins for each size fraction
  • An in-line weighbridge on the RAP conveyor

30 to 40%

Heat the RAP, Not Just the Rock

Superheating the virgin aggregate stops being enough, and costs more fuel the harder you push it. Drying and warming the RAP first takes the load off, as long as the RAP dryer’s blue smoke and light oils are kept out of the filter. Astec rates its Double RAP dryer at up to 40% RAP with zero opacity at the stack.

  • A RAP dryer with proper fume control
  • Mixing after the dryer, in a pugmill or rotary mixer
  • Pulse-jet filtration that copes with steam

40 to 50%

Mix Away From the Flame

Double-barrel dryer-mixers, such as Astec’s Double Barrel, add RAP in an outer mixing chamber away from the burner’s gases, so light oils aren’t driven off and any smoke is drawn back into the flame. Astec reports fuel use virtually unchanged at 50% RAP.

  • A dryer-mixer that keeps RAP out of the hot gas stream
  • Long mixing times, with RAP added first
  • Fractionated RAP fed from several bins

50 to 70%

High RAP, Every Day

At these levels only specialist equipment makes consistently good mix with no odour and a clear stack. Astec’s Double Barrel XHR, for example, is built for RAP additions from 50% up to 70%.

  • Specialist high-RAP dryer-mixers
  • Stainless steel inner drum and flights
  • Stack temperature control across changing mixes

Typical levels from BG Europa’s own guidance and manufacturers’ figures. Your mix designs, materials and permit decide what’s right for your plant.

Talk to Us About Higher RAP

Warm Mix, Without Additives

Foaming the bitumen with a little water lets mix be made 30 to 50°C cooler with no additives, and foaming systems can be retrofitted to batch plants.

Filters That Cope With Steam

Pulse-jet filters clean with a short burst of compressed air, not cold, damp outside air, so steam from RAP is less likely to condense, corrode the casing and blind the bags.

Blue Smoke, Collected

Seal the transfer points, collect the fume at the mixer, silo tops and loadout, then burn it in the flame or filter it out, and blue smoke stops reaching the neighbours.

Mobile and Cold Mix Plant

Plant That Goes to the Job and Sets Up Without Concrete

Our KS mixers grew out of the original Barber Greene stabilisation mixers. They mix soils, cement-bound material, foam mix and emulsions close to the material or the job, and most of our mobile plant stands on level, compacted ground with no concrete foundations.

A green KS continuous mixing plant loading a tipper lorry on site

KS Continuous Mixers

Twin-shaft mixers for soil stabilisation, CBM and lean mix, bentonite and emulsions. Stationary, relocatable or mobile, with loss-in-weight fines dosing.

100 to 725 tonnes an hour

A blue mobile KSF foam mix plant at work beside a stockpile of mixed material

KSF Foam Mix Plants

Self-erecting plants with a foamed bitumen system developed with Soter, and their own generator, built within 3 m wide and 4.875 m high so they move without notification.

Foam mix, CBM and emulsions

A DA60 self-erecting silo standing upright on its own chassis at a quarry

DA Self-Erecting Silos

From the transport position to upright in under two minutes on their own hydraulics, with gravimetric or volumetric fines dosing.

Upright in under two minutes

A green SD 1.0 mobile drying plant: feed hopper, drum and filter on one trailer chassis

SD Mobile Dryers

A complete drying plant on one chassis: feed hopper, parallel-flow drum, pulse-jet filter and discharge screw, for sand, glass and minerals.

SD 1.0: 6 t/h at 5% moisture removal

Landfill Tax Went Up in April

Since 1 April 2026 it’s £130.75 a tonne at the standard rate, and the lower rate for inert soil and stone more than doubled to £8.65. Every tonne of arisings treated and reused on site is a tonne that doesn’t go to the tip. Landfill Tax rates on GOV.UK

Tar-Bound Planings Must Be Mixed Cold

The asphalt plant permit guidance says reclaimed asphalt containing coal tar may only be processed cold, with bitumen emulsion, foamed bitumen or a hydraulic binder. That’s exactly what KS and KSF plants do. Process Guidance Note 3/15, paragraph 5.22

The KS Range at a Glance

Approximate figures; every plant is specified to the job.

ModelKS45KS50KS55KS60KS70
Maximum mixing capacity (t/h)100240350550725
Mixer length (m)1.502.102.282.403.05
Mixer section (m)1.1 × 0.551.1 × 0.551.35 × 0.861.35 × 0.861.35 × 0.86
Electric drive (kW)3037557590
Optional drive (kW)37457590n/a

Spare Parts

Genuine Parts, on the Shelf and Ready to Ship

Our 600 m² stores in Suffolk hold a large stock of genuine parts for immediate dispatch, close to the port of Felixstowe and the London airports.

  • Two machine sets of Barber Greene wearing parts kept in stock.
  • Original engineering files to identify the right Barber Greene part.
  • Pallet, parcel and same-day courier dispatch, in the UK and worldwide.
  • Sale or return stock parts for major refurbishments, such as relining a pugmill.
  • Workshop refurbishment of pugmill gearboxes, screen drive units and screen bodies.

Genuine parts for all plants made by Barber Greene (England) Ltd, made to the original specification.

  • Liner plates
  • Paddle arms
  • Paddle tips
  • Seals
  • Bearings
  • Gears and pinions

They can look like standard items, but many are made to special tolerances, alloys or heat treatments. Fit a look-alike unknowingly and serious problems can follow.

Parts for Astec plants, held in our UK stores.

  • Drag chain
  • Liners
  • Shanks
  • Tips
  • Electrical components

We know the export paperwork too, so parts can go on to Europe, the Middle East and Africa.

Parts for FMA Ullrich skip systems and hot storage silos.

  • Springs
  • Skip wheels
  • Seals
  • Rollers
  • Electrical components

Not on our shelf? It can come by express straight from Germany.

Parts for the plant we design and build: KS and KSF mixers, dryers, filters, feeders, conveyors and elevators, including the foamed bitumen systems on KSF plants.

  • Nozzles
  • Injectors
  • Foam chambers
  • Meters
  • Gauges
  • Pumps

Tell us the plant and its serial number if you have it, and we’ll match the part to our records.

Split paddle arms and replaceable tips inside a pugmill mixer

Request Parts

Send a part number, a description or a photo, and we’ll check stock and come back with a price.

Urgent? Call the stores on 01440 821155. We only use your details to reply.

Any Make of Plant

Barber Greene Is Home Ground. Other Makes Are Welcome.

We grew out of Barber Greene England, so we know those plants inside out and still hold their original engineering files. Our retrofit drum shells and pulse-jet filters fit any asphalt plant, and our project files include work on all of these:

  • Barber GreeneOur home ground: genuine parts from the original files, drop-in pugmills, new screens for batch towers, and gearbox and screen drive refurbishment.
  • ParkerRAP systems and FMA Ullrich hot storage added to Parker batch plants.
  • GencorRAP feed and weighing systems on Gencor batch plants.
  • Standard HavensA pulse-jet filter in place of the old reverse-air unit, same footprint.
  • SherwinA two-bin hot storage extension added to existing Sherwin silos.
  • AstecAstec equipment promoted and installed in the UK, and Astec parts in stock.
  • FMA UllrichHot storage systems installed and extended for national and independent producers.

Tell Us About Your Plant

A fabricator grinding a large dryer drum shell on turning rolls in the workshop, sparks flying

Plant Supplied Worldwide

  • United Kingdom
  • Ireland
  • Isle of Man
  • Falkland Islands
  • Bahrain
  • Dubai
  • Qatar
  • Nigeria
  • Mozambique
  • Swaziland
  • Botswana
  • Trinidad and Tobago

Plants are designed to break down into road loads or shipping containers, and an engineer can travel with them to supervise erection.

About BG Europa

Barber Greene Engineering, Carried On Since 1988

BG Europa (UK) Ltd was formed in 1988 from Barber Greene England, after Astec bought Barber Greene. The technology and expertise came with us, and so did the original engineering files.

In 1994 we moved into purpose-built 800 m² premises at Wickhambrook, ten miles from Barber Greene England’s old home in Bury St Edmunds, bringing the design office, spares department and stores together under one roof.

We’re a small, family-owned specialist firm, so you deal directly with the people who design your plant. And we build it to last: low running costs and a long working life, at a competitive price.

  1. 1988Formed from Barber Greene England, after Astec acquired Barber Greene.
  2. 1994Moved into purpose-built 800 m² premises at Wickhambrook, Suffolk.
  3. 1999Took on the Soter foamed bitumen agency and launched the KSF foam mix range.
  4. 2001Awarded the UK agency for FMA Ullrich hot asphalt storage.
  5. 2016Brought the Astec Fibrebed mist collector to the UK market.
  6. TodayStill family owned, still designing, building and supporting plant.

Questions

What Plant Managers Ask Us

Something else? Call 01440 821155 or send us a message.

Do You Work on Plant Made by Other Manufacturers?

Yes. Our retrofit drum shells and pulse-jet filter sections fit any asphalt plant, our pugmill mixers fit most batch towers, and we’ve fitted recycling systems, hot storage and filters to Parker, Gencor and Standard Havens plants as well as Barber Greene.

Can You Still Supply Parts for an Old Barber Greene Plant?

Yes. We supply genuine parts for all plants made by Barber Greene (England) Ltd, made to original specification and identified from the original engineering files. We keep two machine sets of wearing parts in stock.

How Quickly Can You Send Parts?

Stock parts go out on routine pallet and parcel collections, or by same-day courier when it’s urgent. Our stores are within easy reach of Felixstowe and the London airports, so we ship worldwide. Call 01440 821155 with the part number or a photo.

Can You Do the Work During Our Shutdown?

That’s how most of our installations are planned. We fabricate and pre-assemble so the site work is as short as possible: a screen section can go into a tower in one lift, and a reverse-air filter can be converted to pulse-jet over a weekend.

Do Your Mobile Plants Need Concrete Foundations?

Usually not. Relocatable and mobile KS plants, KSF foam mix plants, DA silos, mobile RAP feeders and mobile baghouses are designed to stand on level, compacted ground.

Can We See Our Plant Before It’s Delivered?

Yes. KS plants are built up in full and tested in our workshop before they ship, and you’re welcome to inspect yours before you take delivery.

Do You Supply Outside the UK?

Yes, across Europe and beyond, from Ireland and Bahrain to Nigeria, Mozambique and Trinidad and Tobago. Plants break down into road loads or containers, and an engineer can travel with the plant to supervise erection.

Can You Help Us Use More Recycled Asphalt?

Yes. Depending on your plant, that might mean a better RAP feed and weighing system, a recycle breaching in the drum, a pulse-jet filter that copes with steam, or a double-barrel dryer-mixer for 50% RAP and more. See what each level takes.

Contact

Tell Us About Your Plant

Send us the details and we’ll come back to you. Rather talk it through? Call 01440 821155.

What Do You Need?

Need parts? Use the parts request form. We only use your details to reply to you.

Call

01440 821155

From outside the UK: +44 1440 821155

Visit

BG Europa (UK) Ltd
Pipers Drove, Giffords Lane
Clopton, Wickhambrook
Newmarket
Suffolk CB8 8PQ

Finding us: on the A143 in Wickhambrook, turn at the crest of the hill into Giffords Lane, signposted Fire Station. We’re 30 yards on the right. Open in Google Maps
Call Send an Enquiry