Solar Panels, Batteries and EV Chargers, Designed Around Your Roof.
No generic packages. We design every system for your roof and the way you use energy, and our in-house team fits it.
- 1 to 2 days usual solar and battery fit
- 25+ years industry experience
- 2 offices Blackpool and Darwen

What we fit
Build Your System
Tick what you would like and see your system come together. Your choices travel with you to the quote form, so we can start with the right questions.
Your System
Nothing chosen yet. Tick anything on the list to start.
A starting point for your quote, not a price.
Designed for your roof, whether it is slate or tile, flat or metal, or mounted on the ground.
Keep your daytime solar for the evening, or charge from the grid on a cheaper overnight tariff.
A smart charger for your drive or garage. Most of the chargers we fit can be linked to your solar panels.
An air source heat pump for heating and hot water, sized after a survey of your home, insulation and radiators.
Heat pumps (opens in a new tab)Why us
Why Homeowners Choose Smarter Energy UK
No Generic Packages
We design every system for your roof orientation and the way your household uses energy.
Advice Without the Hard Sell
Transparent, expert guidance from a team that wants what is best for your home.
We Handle the Paperwork
From the first site assessment to grid approval and the final installation.
Fully Certified
We are MCS accredited and RECC members.
… They tidied up as they went along. They remained professional throughout. They went above and beyond. …
How it works
From First Call to Switch-On
Ask for Your Free Quote
Use the form below, call 0333 444 1972 or send a WhatsApp to 07760 987975.
Site Assessment
We look at your roof, your fuse box and wiring, and how you use energy through the day.
Your Design
We design the system for your roof and your energy use. Your design report includes a 3D model of your roof with the exact panel layout.
Paperwork and Grid Approval
We handle the paperwork, including the grid application to your network operator.
Installation
Our in-house team fits your system. A standard home solar and battery installation is usually completed within 1 to 2 days.
Switch-On
Once your system is commissioned, you can monitor your energy production in real time on your mobile app.
Our work
Installations Across the North West

Ground-mounted solar panels in Cumbria 
Battery storage and inverters in Lancashire 
A solar farm in the Lake District 
Commercial solar in Cumbria 
Bird protection fitted in Blackpool
Reviews
What Our Customers Say
Reviews left on Google, as they appear on our website.
Amazing company. Great team. Cannot praise them enough. They do everything they promise and go above and beyond. Highly recommended. Special thanks to Paul, Adam, Matt, Neil, Ben and Nathan.
Assad Mahmood, from Google … The entire process was seamless, and everything is working perfectly on the app and I can see everything throughout the day its really clever. … I really appreciate all the hard work they put in to getting it all sorted and up and running in the one day. …
Mike, from Google From start to finish Smarter Energy UK were very professional and courteous and carried out a fantastic job. The staff were very polite and helpful, and did an amazing job. Thanks again guys, for doing such an excellent job. I would highly recommend this company.
Lauren McGrath, from Google … Friendly lads who kept me informed about what was happening. Highly recommend Smarter Energy UK.
David Gravner, from Google
Where we work
From Lancashire to the Lakes and Beyond
Our engineers live and work in the regions we serve. From our offices in Blackpool and Darwen, we cover:
Lancashire and the North West
Preston, Blackpool, Morecambe, Lancaster, Blackburn, Burnley, Chorley, Leyland, Fleetwood, Lytham St Annes, Poulton-le-Fylde.
Greater Manchester and Merseyside
Manchester, Wigan, Bolton, Bury, Rochdale, Oldham, Stockport, Liverpool, St Helens, Southport, Wirral, Warrington, Widnes.
Cumbria and the Lake District
Windermere, Bowness, Keswick, Ambleside, Grasmere, Coniston, Hawkshead, Kendal, Penrith, Cockermouth, Ulverston, Grange-over-Sands, Whitehaven, Barrow-in-Furness, Appleby, Sedbergh, Kirkby Lonsdale, Millom, Wigton, Egremont.
Yorkshire
Leeds, Sheffield, Bradford, York, Harrogate, Huddersfield, Doncaster, Hull, Skipton, Ripon, Scarborough, Wakefield, Castleford, Pontefract, Wetherby.
Cheshire, the Midlands and Wales
Chester, Crewe, Northwich, Macclesfield, Birmingham, Wolverhampton, Coventry, Leicester, Nottingham, Derby, Stoke-on-Trent, Wrexham, Rhyl, Llandudno, Bangor.
South West Scotland (Galloway)
Dumfries, Gretna, Annan, Lockerbie, Langholm, Newton Stewart, Castle Douglas, Kirkcudbright, Wigtown, Stranraer, Dalbeattie, Gatehouse of Fleet.
Good to know
Questions Homeowners Ask
How long does a typical solar installation take?
A standard residential solar and battery installation is usually completed within 1 to 2 days, with minimal disruption to your daily routine.
Do I need a south-facing roof?
No. South-facing roofs generally receive the most direct sunlight, but modern high-efficiency panels can be installed on east or west-facing roofs, and in some cases these give more energy in the early morning or late afternoon.
Do solar panels work on cloudy days?
Yes. Modern solar panels generate electricity from daylight, not just direct sunshine. They perform at their peak on bright, clear days and continue to produce energy in overcast weather.
Can I add a battery to my existing solar panels?
Usually, yes. We fit AC-coupled batteries, from brands such as SolaX, Sigenergy, Hanchu, Powervault and Tesla, that can be retrofitted to almost any existing solar array.
Can I sell the electricity I do not use?
Yes, through the Smart Export Guarantee (SEG), which pays you for the surplus electricity your panels send to the grid. Your supplier will ask for your system's MCS certificate, a smart or export meter and approval from your network operator, and we help you through the paperwork.
Do I need off-street parking to have an EV charger installed?
Yes, in almost all cases you will need a dedicated driveway or garage, so the charger is safe, accessible and compliant with electrical regulations. If you do not have off-street parking, our team can advise you on public charging in your area.
How long does it take to install an EV home charger?
A standard installation typically takes just a few hours, so we can often get your charger up and running in a single day.
Should I choose a tethered or untethered charger?
It comes down to convenience. A tethered charger has the cable permanently attached, so you just grab it and plug in. An untethered charger has a socket for your own cable, which gives a cleaner look when you are not charging.
Do I need to upgrade my home's electrical supply?
Most modern UK homes are suited to a standard 7kW home charger without any major electrical upgrades. During our survey, our engineers check your existing fuse box and wiring to confirm everything is safe and ready.
Speak to a Real Person in Lancashire
- Main office0333 444 1972
- WhatsApp, or call for a fast response07760 987975 (opens WhatsApp in a new tab)
- Emailinfo@smarterenergyuk.co.uk
Blackpool Office
Blackpool Technology Centre
Faraday Way, Blackpool FY2 0JW
Darwen Office
Unit 20 Railway Road Industrial Estate
Railway Road, Darwen BB3 3EH
Business Hours
- Monday to Friday
- 8:30am to 6:30pm
- Saturday
- 9am to 1:30pm
- Sunday
- Closed
