Three rope access technicians working down a glass curtain wall high above the elevated M4 at Brentford, west London.

High-level glass replacement, leak repairs and inspections: Glaziers first. Rope access second.

We replace, repair and inspect high-level glass on live commercial buildings across the UK. Our own IRATA technicians, our own Level 3 supervisors, and whichever access method your building actually needs.

Broken glass at height, made safe. Our IRATA technicians assess the damage, make the area safe and plan the permanent replacement, with a photographic record at every stage.

Every pane, accounted for. Inspections and planned maintenance for atria, curtain walls and glass roofs, with every defect photographed, mapped and prioritised, and costed recommendations you can budget against.

We find the leak before we fix it. Water testing and investigation to find exactly where and why your glazing lets water in, then a repair that targets the cause and a test that proves it.

Planned work

Request a free site survey

Free survey and quote, with no obligation.

Glass broken at height?

Call 020 3941 1844

Or send us photos, and see what to do first.

Go straight to glass replacement, inspections and maintenance or leak repairs.

Three rope access technicians working down a glass curtain wall high above the elevated M4 at Brentford, west London.
Location
Brentford, west London
Work
Schüco curtain wall, annual maintenance
Access
Rope access, our own IRATA team
Below
The elevated M4, still open to traffic
  • An IRATA member company since 2018. To our knowledge, the only UK-based IRATA member company focused solely on high-level glazing.

    Check our IRATA listing (opens in a new tab)
  • MembershipIRATA Full OperatorMember no. 8188/O
  • Rating5.0 on GoogleFrom 25 reviews
  • CertificationISO 9001 and 14001UKAS-certified
  • SupervisionIn-house IRATA Level 3Never subcontracted

Glass broken at height? Start here.

If glass has cracked or shattered overhead or on a façade, deal with people first, then evidence, then the fix.

  1. Clear the area below.Keep people out of the zone where glass could fall, inside and outside the building.
  2. Don’t let anyone improvise.Removing broken glass at height is dangerous without the right access and training. If spontaneous breakage is possible, the fracture point needs to come out whole so it can be tested.
  3. Call us, and send photos if you can.A shot of the break, the wider elevation and the area below helps us plan safe access before we arrive.

Call our make-safe team

Call 020 3941 1844

Our technicians assess the damage and the risk to people below, then make it safe with glazing film, controlled removal or temporary boarding. Out-of-hours attendance can be planned by agreement.

Send photos insteadOr email info@skyaccessglazing.co.uk

“Within 14 hours of the incident happening Sky access had made safe. Within 3 weeks works were completed to replace the windows, all within tight timescales.”

Darran, Google review. One client’s experience after two windows were broken by stones dropped by seagulls.

What happens next

  1. AssessAn IRATA technician checks the damage and the risk below.
  2. Make safeGlazing film, controlled removal, or temporary boarding and weatherproofing.
  3. InvestigateWe find the cause, and arrange nickel sulphide testing if breakage was spontaneous.
  4. ReplaceA clear quotation, scope and programme for the permanent unit.

Facilities, property and construction teams we’ve worked for

  • CBRE
  • JLL
  • Savills
  • Knight Frank
  • Cushman & Wakefield
  • Mitie
  • BAM
  • Galliford Try
  • MAPP
  • Workman
  • Campus Living Villages
  • Radisson Hotels

What’s happening with your glass?

Choose the closest match. We’ll show you how we handle it, and your enquiry will reach the right person with the right details.

A crane lifting a replacement glass unit up a Central London office façade to rope access technicians.

Replacement and make-safes

Glass is broken, or needs replacing

Cracked, shattered, misted or non-compliant units at height, including emergency make-safes.

High-level glass replacement and emergency make-safes

When a unit fails at height, two problems arrive at once: a risk to people below, and a replacement that has to match a system that may be decades old. We handle both. First we make the area safe. Then we find out why it failed, source a compatible unit and replace it at a time that suits your building, often overnight or at a weekend.

What’s included

  • Make-safes for fractured or shattered overhead and façade glass
  • Laboratory testing for nickel sulphide inclusions where spontaneous breakage is suspected
  • Specification tracing and matching of tints, coatings and frits, even without O+M (operation and maintenance) information
  • Oversized and heavy units, including units over 500kg
  • Heat soak tested toughened glass, as company policy
  • Council permits, TfL liaison and ground marshalling handled for you

From the project fileAt Stansted Airport we replaced oversized airside units weighing over 250kg each, working in night engineering hours with a four-hour limit per replacement.

Five rope access technicians spaced across a glazed office façade during a condition inspection.

Inspections and planned maintenance

Glass needs inspecting or maintaining

Health and safety inspections, condition surveys and planned maintenance for glazed façades, atria and roofs.

Glazing inspections and planned maintenance

If you manage a building, keeping its glazing safe is part of your duty of care. An inspection gives you a documented record of what’s up there, what condition it’s in and what needs doing first. A planned maintenance programme then keeps seals, gaskets and fixings serviced, so small defects don’t turn into leaks, breakages or emergency call-outs.

What’s included

  • Photographic defect reports with location maps
  • Risk commentary, with urgent items flagged separately
  • Costed recommendations you can budget and prioritise against
  • Spot repairs during the same visit where practical
  • Seal servicing, torque testing of fixings and gasket checks
  • Maintenance packages that can include a rolling water ingress warranty, subject to terms

From the project fileOn a 10-floor office in East London, multiple rope access teams inspected every pane of glass and mapped each defect for the client’s audit.

Three technicians kneeling on a flat glass roof, resealing its joints, with a tower reflected in the glass.

Atria, glass roofs and curtain walls

Water is getting in

Leaks through atria, glass roofs, rooflights and curtain walls, diagnosed before anything is repaired.

Atrium, glass roof and curtain wall leak repairs

Glazing leaks are easy to patch and hard to fix. Water doesn’t always appear where it gets in, so surface sealant rarely lasts. We diagnose first, with an access assessment, water testing and, where needed, an intrusive investigation. Then we repair the cause, whether that’s failed seals, missing gaskets or a drainage detail that was wrong from the start, and water test again to prove it.

What’s included

  • Water testing to pinpoint the leak path
  • Replacement of silicone seals, gaskets, butyl glazing tape, pressure plates and cover caps
  • Drainage improvements where water is pooling or tracking
  • System-matched parts through the Schüco, Kawneer, Reynaers, Technal and Smart Aluminium technical teams
  • A photographic completion report, before and after

From the project fileA London atrium had leaked for years despite repairs by several contractors. Our investigation found incorrect membrane detailing and missing gaskets. We refurbished it with Schüco components and a new drainage detail, and a water test proved the fix.

Specimen defect mapIllustrative, not to scale
Specimen defect map of a curtain wall elevation, not to scale16 bays by 5 floors, with 3 panes replaced, 14 inspected and 4 resealed, and 2 rope drops.ABCDEFGHJKLMNPQR1234524,000 mm1,500 mm bay3,600GroundC3K5P2
Specimen defect map of a curtain wall elevation, not to scale8 bays by 6 floors, with 3 panes replaced, 5 inspected and 4 resealed, and 2 rope drops.ABCDEFGH12345612,000 mm3,600GroundB4E2H6
Specimen defect map of a curtain wall elevation, not to scale7 bays by 5 floors, with 2 panes replaced, 5 inspected and 3 resealed, and 1 rope drops.ABCDEFG1234510,500 mm3,600GroundB3F5
  • Replaced, pane code
  • Inspected
  • Resealed, water tested
  • Rope drop, technician
An example of how an inspection can be handed back: each defect photographed and located on a façade map, so your team knows what was found and where.

Two trades. One team.

High-level glazing needs two specialisms at once. Rope access firms know how to reach the glass. Glaziers know what to do when they get there.

Many projects end up with one of each, and a gap in the middle where responsibility gets lost. Sky Access Glazing closes that gap. Our technicians come from commercial glazing backgrounds and hold IRATA rope access qualifications up to Level 3. They’re employed by us, supervised by us and accountable to us, so you deal with one specialist from survey to sign-off.

Two Sky Access Glazing technicians on ropes working on an office window, seen from inside the room.
Working from the façade while the office carries on inside.
  • Glass expertise

    We trace original specifications, match tints, coatings and frits, and work with the technical teams at Schüco, Kawneer, Reynaers, Technal and Smart Aluminium. Every toughened pane we install is heat soak tested.

  • Access expertise

    An IRATA member company, free to choose rope access, MEWPs (mobile elevating work platforms), spider cranes, glazing robots or scaffold, job by job.

  • One point of accountability

    We never subcontract our technicians or our supervision. Specialist plant comes from partners we plan and manage, including Ainscough cranes and APA Height Access.

Five rope access technicians descending a tall glazed atrium façade between two glass towers.

IRATA member companyFull Operator

8188/O

Established in 2012, and an IRATA member company since 2018. To our knowledge, the only UK-based IRATA member company focused solely on high-level glazing.

Check our IRATA listing (opens in a new tab)

Our IRATA Technical Authority is director Jon Wilson.

IRATA-trained is common. An IRATA member company is not.

Plenty of glazing contractors say their technicians are IRATA-trained. That tells you about the individuals. IRATA member company status tells you about the business that sends them, and it asks far more of the company.

Think of it this wayIt’s the difference between a qualified electrician and a registered electrical contractor. One proves a person can do the work. The other proves the company runs it properly: its procedures, its supervision, its records and its audits.

What IRATA requires of a member company

  • Every rope access operation supervised by an IRATA Level 3 technician
  • Documented rope access procedures and controls, followed on every job
  • A named Technical Authority and a Rope Access Manager
  • An internal audit at least once a year, plus independent audits on IRATA’s membership cycle
  • Every rope access technician IRATA qualified, and retrained every three years
  • Independent assuranceThe method, supervision and competence behind your RAMS (risk assessments and method statements) have been audited by someone other than us.
  • Paperwork that stands upRecords your insurer and your own health and safety team can rely on.
  • One accountable companyNot a chain of subcontractors, each with their own standards.
How to tell the difference when you shortlist
How to tell the difference when you shortlist
QuestionA contractor with IRATA-trained staffAn IRATA member company
Who IRATA has assessedThe individual techniciansThe technicians and the company
Level 3 supervisionUp to the contractorRequired on every rope access operation
ProceduresSet by the contractorDocumented to IRATA’s requirements and audited
Company auditsNot part of technician trainingAnnual internal audit plus independent IRATA audit
How you checkAsk for individual certificatesSearch the public IRATA member register
Request a free site survey

Free survey and quote, with no obligation.

Rope, robot or crane. We choose what the building needs.

Reaching the glass is the easy part, provided you pick the right way up. We survey the building, the glass and everything around it (footfall, traffic, loading limits, opening hours) and choose the safest, least disruptive method.

  • Rope access

    Right for
    Façades, atria and inspections where scaffold would be slow, costly or disruptive.
    Where we’ve used it
    Every pane of a 10-floor East London office; inside a Surrey atrium, rigged from its steelwork.
  • MEWPs and truck-mounted platforms

    Right for
    Quick reach from the ground, with integrated glass lifting.
    Where we’ve used it
    An early weekend replacement at a 24/7 Cambridge office, with the car park handed straight back.
  • Spider cranes

    Right for
    Compact lifting where larger cranes can’t go or can’t be loaded.
    Where we’ve used it
    Airside at Stansted; on a superstore car park roof, on weight-spreading mats.
  • Glazing robots and vacuum lifters

    Right for
    Heavy units with precise control and no manual lifting, run by LEEA-trained technicians.
    Where we’ve used it
    A 500kg, 3m × 3m unit at a London bank headquarters.
  • Roof-level floor cranes

    Right for
    Lifting from above when a street crane would mean road closures and licences.
    Where we’ve used it
    Southampton & New Forest Magistrates; a Central London headquarters façade.
  • City and mobile cranes

    Right for
    The heaviest lifts, positioned to avoid the most expensive closures.
    Where we’ve used it
    Inside a TfL compound beside a red route; with Ainscough at Newmarket Racecourse.
  • Scaffold, towers and crash decks

    Right for
    When they really are the safest option. We’ll say so.
    Where we’ve used it
    A 14th-floor penthouse with a lifting rig; a crash deck under an Oxfordshire rooflight.
An orange spider crane and a scissor lift working together on the glazing of a commercial building.
Spider crane and scissor lift, working one elevation together.

The obvious way is often the expensive way

  • Red route closure avoided.We secured permission to place a crane inside a TfL compound instead.
  • Road closure and crane licence avoided.A counter-balanced floor crane at roof level did the lift.
  • A trading day protected.A superstore atrium pane replaced in one out-of-hours shift, with everything gone before opening.

Permits and people, handled. Council permits, TfL liaison, pavement closures and ground marshalling are part of the package.

Heavy, oversized and overhead.

The units that stop most general glaziers are the ones we plan for. A few from the project file.

Detail
Curtain wall unit
Location
London bank headquarters
Detail drawing of a 3,000 by 3,000 millimetre double glazed unit weighing over 500kgElevation of the unit with a four-pad vacuum lifter at its centre and a lifting point above, dimension chains of 3,000 millimetres on two sides, and a section through the double glazed unit showing the outer pane, the cavity and the inner pane.SectionOuterCavityInnerLoad 500kg+3,000 mm3,000 mm
Detail drawing of a 3,000 by 3,000 millimetre double glazed unit weighing over 500kgElevation of the unit with a four-pad vacuum lifter at its centre and a lifting point above, dimension chains of 3,000 millimetres on two sides, and a section through the double glazed unit showing the outer pane, the cavity and the inner pane.SectionOuterCavityInnerLoad 500kg+3,000 mm3,000 mm
500kg+

A 3m × 3m double glazed unit, installed with a glazing robot over a weekend.

Two technicians guiding a 500kg glass unit into a ground floor curtain wall with a glazing robot.
The same unit, guided in by glazing robot. No manual handling.
  • Central London hotel400kg+

    Each of two entrance units, lifted by spider crane between PASMA towers.

  • Leisure centre4.6m

    A 300kg+ unit that local glaziers couldn’t source or fit.

  • Oxfordshire office76DGUs

    Double glazed units in one rooflight, with improved solar control. Won on competitive tender.

  • Residential tower14th floor

    A shattered penthouse unit, after the client had searched two years for a contractor.

The glass other contractors walk away from.

Real buildings, real constraints and the methods that solved them.

Featured project
Drone view of a mobile crane lifting replacement glazing to The Jockey Club grandstand at Newmarket Racecourse.
The Newmarket Racecourse grandstand from the air, before the work.
Before. The grandstand from the air.
Rope access technicians guiding a unit on a vacuum lifter into the grandstand façade.
During. Units guided in on a vacuum lifter.
The finished glazed façade of the grandstand.
After. Handed back before the season.

Replacement

Newmarket Racecourse: a grandstand façade, replaced before the racing season

Client
The Jockey Club
Scope
The full glazed façade to a new compliant specification, keeping its solar performance.
Access
In-house IRATA rope access, supervised at Level 3, with Ainscough cranes and vacuum lifters.
Glass
Custom units from our European supply partners.
Waste
Segregated and recycled under our ISO 14001 system.
3weeksA fixed window before racing began.
14tonnesOf removed glass, all recycled.

Replaced inside the three-week window, so the racing season went ahead without interruption.

Read the Newmarket Racecourse case study (opens in a new tab)
Show projects about
  • A spider crane and mobile platform replacing oversized airside glazing at Stansted Airport at night.

    Replacement4-hour windows

    Stansted Airport: oversized airside units in night engineering hours

    How we did it
    Challenge
    Fractured units over 250kg each, airside, with a four-hour limit for each replacement.
    Method
    A spider crane and small MEWP for a minimal footprint, and a flatbed bought for the job.
    Result
    Replaced at night with minimal disruption to airside operations.
    Read the case study: Stansted Airport (opens in a new tab)
  • A night-time glazing crew steadying a replacement unit on a vacuum lifter at a London rail site.

    ReplacementNight works

    TfL London rail site: fritted overhead glass above closed lifts

    How we did it
    Challenge
    An overhead breakage had closed the lifts below, with limited O+M information and tight access.
    Method
    A sample panel with several frit opacities approved first, then rope access, gantries, vacuum lifters and a city crane.
    Result
    Completed within engineering hours and signed off by the client and the TfL team.
    Read the case study: TfL London rail site (opens in a new tab)
  • The sloping glazed roof of a London commercial atrium after its Schüco refurbishment.

    LeaksYears of leaks, fixed

    London Schüco atrium: the leak several contractors couldn’t stop

    How we did it
    Challenge
    Years of water ingress, failed repairs by others and internal protection the client wanted gone.
    Method
    An intrusive investigation, then correct Schüco parts and a pitched, drained transom.
    Result
    A successful water test, and the internal protection could come down.
    Read the case study: London Schüco atrium (opens in a new tab)
  • Rope access technicians working down the dark-framed glazed façade of a large office building.

    Inspection10 floors

    East London office: every pane inspected, every defect mapped

    How we did it
    Challenge
    No façade inspection for years, street-level obstructions and an audit to satisfy.
    Method
    Multiple IRATA rope access teams worked down the façade, photographing each defect.
    Result
    A photographic defect report with location maps, so remedial works could be prioritised.
    Read the case study: East London office (opens in a new tab)
  • A rope access technician working on a curved feature façade behind external steelwork at Southampton and New Forest Magistrates.

    ReplacementNo O+M records

    Southampton & New Forest Magistrates: a unit behind external steelwork

    How we did it
    Challenge
    A shattered patch-fitted unit with no records, behind external steelwork that ruled out MEWPs and a conventional crane lift.
    Method
    Site measurement and drawings for manufacture, IRATA rope access and a counter-balanced floor crane at roof level.
    Result
    The new unit was guided around the steelwork and installed safely.
    Read the case study: Southampton & New Forest Magistrates (opens in a new tab)
  • More from the project file

    • Milton Keynes curtain wall. Non-safety glass found and replaced with laminated, water tested area by area, with a long-term guarantee.
    • South East shopping centre. Multiple atria brought watertight, with long-term water ingress guarantees and a maintenance contract.
    • Brentford office. Annual Schüco curtain wall maintenance, and we were reappointed the following year.
    • Wales headquarters. Internal scaffold, rope access and MEWPs combined on one weekend replacement.

What clients say afterwards.

Rated 5.0 out of 5 from 25 Google reviews, September 2026.

Read our reviews on Google (opens in a new tab)

“It required plenty of experience with lifting the unit into situ using a crane and a team of people. The whole project ran very smoothly.”

Paul H.Large unit replacement, Heathrow Approach, Slough

“They are quick to respond and reliable, post work reports are thorough and quotes are fair.”

Clare M.Repeat client

“Sky Access identified the issue carried out the repairs and tested the repair with very little impact to the tenant.”

Gary F.Leak detection to glazing at height

Need a glazier who works at height?

Tell us what’s happening and where, and we’ll arrange a free site survey.

Request a free site survey

From survey to signed-off handover.

Every job follows the same documented process, so you always know what happens next and what you’ll hold at the end.

  1. Survey

    A free site survey by an experienced technician. We inspect the glass, measure the defective units and work out the safest access: rope access, plant, scaffold or a combination.

  2. Source

    We review any O+M information and match thickness, coatings, tints and frits through our European supply chain. With no paperwork, we research the original specification.

  3. Install

    Site-specific RAMS are agreed before anyone goes up, and the work is scheduled around your building, often overnight or at weekends.

  4. Hand over

    An itemised photographic report of conditions before and after, water test results where they apply, and confirmation of compliance with BS 6262 and the Work at Height Regulations 2005.

Request a free site survey

Free survey and quote, with no obligation.

Pre-qualified before you ask.

The paperwork your supply chain needs is already in place. IRATA, our ISO certification body, CHAS, Constructionline and SafeContractor have each assessed how we work.

  • IRATA International

    Full Operator member company, audited by IRATA.No. 8188/O

  • ISO 9001

    Quality management, independently certified.UKAS accredited

  • ISO 14001

    Environmental management, independently certified.UKAS accredited

  • CHAS

    Contractor health and safety pre-qualification.Accredited contractor

  • Constructionline

    Supply chain pre-qualification for public and private buyers.Member

  • SafeContractor

    Contractor health and safety accreditation.Approved

  • Glass and Glazing Federation

    The trade body for the glazing industry.Member since 2018

  • Schüco

    Direct access to Schüco technical support and system components.Partner

Standards. We work to BS 6262, the code of practice for glazing in buildings, and the Work at Height Regulations 2005. Our technicians hold CSCS, IRATA (up to Level 3), IPAF, PASMA and LEEA vacuum lifting qualifications.

Repair first, recycle the rest. Where a sound frame can be refurbished, we’ll recommend repair over replacement. Glass that does come out is segregated and recycled under our ISO 14001 system.

Ask for our pre-qualification pack

Accreditation certificates and insurance details, sent on request.

Tell us about the glass.

Fixed at height. Proven on paper.

Share what’s happening and where. A specialist will review it and contact you to arrange a free, no-obligation site survey. Photos help us plan safe access before we visit.

  1. The glass
  2. The site
  3. You

There is a problem

    Step 1 of 3: the glass

    What do you need help with?

    Takes about two minutes. The more you tell us, the more useful our first reply.

    What’s happening?
    Which glazing is it? (optional)Choose all that apply.
    Step 2 of 3: the site

    Where is it, and how urgent?

    How urgent is it?
    Where the glazing is. The first part is fine, like EC2V.
    So we know who uses it.
    A rough idea helps us plan access.
    What you can see, when it started, and any access limits such as road frontage, trading hours or tenants.
    Photos (optional)Up to 3 photos. The break or leak, the wider elevation and the area below are most useful. Take them from a safe place.

      Step 3 of 3: your details

      How should we reach you?

      We’ll only use your details to reply to this enquiry. Read our privacy policy (opens in a new tab).

      Prefer to talk?

      Call 020 3941 1844

      Glass broken now? Call rather than filling in the form, and we’ll talk you through the make-safe and any call-out cost.

      Email

      info@skyaccessglazing.co.uk

      For planned work, every enquiry includes

      • A free site survey
      • An itemised quotation before any work starts
      • No obligation
      • Nationwide coverage from our Suffolk base

      What happens next

      1. We review it. A specialist reads your details and photos.
      2. We call you. To agree a survey time and understand access.
      3. We survey. Free, and with no obligation.
      4. You get a quotation. Itemised, with the access method explained.

      Questions facilities teams ask us

      Something we haven’t covered? Call 020 3941 1844 or send us the details.

      What should I do if glass breaks at height?

      Clear and cordon the area below so nobody is in the fall zone, then call us on 020 3941 1844. Don’t let anyone without the right access and training try to remove it.

      If spontaneous breakage is a possibility, tell us before anything is moved: the fracture point needs to come out whole so it can be laboratory tested for nickel sulphide inclusions. Photos of the break and the area around it help us plan safe access.

      What does “IRATA member company” mean, and why does it matter?

      IRATA International sets the standard for industrial rope access. Individual technicians can be IRATA-trained, but a member company is itself audited: every rope access operation must be supervised by a Level 3 technician, procedures must be documented, and the company must pass internal and independent audits.

      Sky Access Glazing has been a member company since 2018 (Full Operator, no. 8188/O), and you can check that on the public IRATA member register.

      Do you subcontract any of the work?

      Not the glazing, the rope access or the supervision. Our technicians are employed by us and supervised by our own Level 3 staff. Where a job needs specialist plant, such as a large crane, scaffold or specialist transport, we bring in trusted partners and plan and manage them ourselves, so you still have one point of contact and one accountable company.

      Is rope access cheaper than scaffolding?

      Often, because there is no long hire, less set-up time and less on the ground around your building. But not always. We assess every site on its merits and recommend the safest, most cost-effective method, which may be rope access, a MEWP, a spider crane, a glazing robot, scaffold or a combination. On a 14th-floor penthouse, a scaffold with a lifting rig was the right answer, and we said so.

      Do you manage road closures, permits and TfL liaison?

      Yes. If a glass replacement needs a crane, a spider crane or a street-level cordon, we handle council permits, TfL liaison and ground marshalling as part of the package. On one Central London job we secured permission to place a crane inside a TfL compound, which saved the client the cost of closing a red route.

      Can you match our existing tinted, fritted or bespoke glass?

      Yes. We review any O+M information and work with our European supply partners to match thickness, coatings, tints and frits. Where there are no records, we research the original specification. For one hotel we traced the glass back to the original installer’s records from the early 2000s. For bespoke frits we can make a sample panel for your approval first.

      Can you do the work without closing our building?

      In most cases, yes. We plan access around footfall, opening hours and loading limits, and often work overnight or at weekends. A fractured atrium pane above a superstore entrance was replaced in one out-of-hours shift, with every piece of equipment gone before the next trading day.

      What do we receive when the work is finished?

      An itemised photographic report showing conditions before and after, water test results where they apply, and confirmation that the work complies with BS 6262 and the Work at Height Regulations 2005. For inspections you’ll also get location maps of each defect, a risk commentary with urgent items flagged, and costed recommendations.

      Do you guarantee your leak repairs?

      We diagnose first and water test on completion, so you have evidence the repair worked. Our planned maintenance packages can include a rolling warranty against water ingress, subject to terms, and we’ve issued long-term water ingress guarantees on refurbishments such as a Milton Keynes curtain wall and a South East shopping centre’s atria. We’ll set out exactly what’s covered in your quotation.

      How often should commercial glazing be inspected?

      It depends on the system’s age, condition and exposure, and on what’s beneath it, so there’s no single answer. As duty holder you need to be able to show that your glazing is safe and maintained, and your insurer may set its own requirements. After an initial inspection we’ll recommend an interval for your building and set it out in the report, alongside the repairs that should come first.

      Call usRequest a survey