Civil and infrastructure engineers, Suffolk

The Engineering That Makes a Development Work.

Highways, drainage, SuDS and flood risk design for developers and housebuilders, from the first appraisal to adoption, across East Anglia, the South East and the Midlands.

  • 1,200 homesat White House Farm, Sprowston: we designed the infrastructure
  • 200,000 m³of earthworks designed for the Blakenham Glasshouses
  • S38, S278, S104the agreements that get roads and sewers adopted
  • 24 peoplein two offices, Claydon and Bury St Edmunds
Aerial view of a finished housing estate at Rayne Road, Braintree: red and grey roofed homes along curving estate roads, gardens and parking courts, with the main road along the edge and a new phase under construction beyond
Rayne Road, Braintree: 127 homes on an extremely steep site

What we do

Five Services, Separately or as a Package

Bring us in for a single Flood Risk Assessment, or for all five as a site moves from purchase to adoption.

  1. Pre-Planning

    Pre-purchase and planning assessments that find the cost and programme issues before land changes hands, so the price reflects the engineering.

    • For landowners through to major national residential developers
    • Access and drainage strategy set from the start
    • Earthworks designed and quantified in 3D
    More about Pre-Planning (opens in a new tab)
  2. Flood Risk Assessments

    Flood Risk Assessments for sites of every size, to satisfy National Planning Practice Guidance and the Planning Authority.

    • Fluvial, tidal, surface water and groundwater flooding, existing sewers and infrastructure failure
    • Practical, economical ways to limit the impact downstream
    • For Veolia’s new waste transfer building at Costessey, how planning conditions would be met and flood risk handled
    More about Flood Risk Assessments (opens in a new tab)
  3. Drainage Design

    From a few homes on private drainage to large residential sites with sewers designed for adoption, in the latest drainage software.

    • Section 104 sewer designs for adoption
    • Site inspections and a realistic strategy at inception
    • Designs that meet the ever-expanding policy of Planning and Building Regulations
    More about Drainage Design (opens in a new tab)
  4. Sustainable Drainage Systems

    SuDS that control runoff rates and volumes, clean the water and add amenity and biodiversity. Built in from inception, they can be very economical.

    • Permeable paving, wet and dry swales, infiltration and detention ponds
    • Management and maintenance schemes for construction and the life of the development
    • Construction Surface Water Management Plans for contractors
    More about Sustainable Drainage Systems (opens in a new tab)
  5. Roads & Highways

    Highway design for every type of carriageway, from a simple crossover agreement to major interchange improvements.

    • Section 38 and Section 278 Agreements, Technical Approval
    • Minor Works and Temporary Site Access Agreements
    • Condition surveys and inspections of on-site road construction
    More about Roads & Highways (opens in a new tab)

How a site comes through

From Field to Adoption

From a field with a red line round it to roads and sewers adopted by the authorities: step an illustrative site through the four stages, with one of our schemes at each.

Illustrative site plan, not to scale An illustrative site, not to scale, with an existing road along its southern edge and a watercourse along its western edge. Shown now: stage 1 of 4, Appraise: the red line boundary, the contours that show how the land falls, a possible access from the existing road and a possible outfall to the watercourse.
Illustrative site, not to scale. Each stage adds to the drawing.

Stage 1 of 4

Before You Buy

We look at how the land falls, how the site can be reached from the road and where its water can go, so cost and programme issues show up before the land changes hands.

  • The red line boundary
  • Contours: how the land falls
  • A possible access from the road
  • A possible outfall to the watercourse
Rolling green farmland under a blue sky at Micklewell Park, Daventry

Micklewell Park, Daventry

A 38 ha greenfield site, for the vendor. Buyers had struggled to picture the earthworks on its rolling, sometimes steep land, so we designed and quantified them in 3D, removing risk and adding value.

Read the project about Micklewell Park (opens in a new tab)
Discuss Your Site

The form will note the stage you chose.

Selected projects

From Single Plots to 1,200 Homes

Housing estates and urban redevelopment, a filled chalk quarry and around 14 hectares under glass.

  • A reed-fringed pond in open grassland at White House Farm, Sprowston, with homes beyond

    Residential

    White House Farm, Sprowston

    1,200 homes

    For a consortium of developers: new highway and drainage infrastructure, diversion of strategic Water Authority apparatus, watercourse culverting and off-site cycleway upgrades, through two phases of infrastructure construction.

    Read the project about White House Farm (opens in a new tab)
  • New stone-coloured homes facing a wide green at Kingsfleet, Thetford

    Residential

    Kingsfleet, Thetford

    343 units

    The first phase of the 5,000-home community at Kingsfleet, for Hopkins Homes: SuDS drainage and highway infrastructure, bus and cycle routes, and strategic infrastructure for the phases that follow.

    Read the project about Kingsfleet (opens in a new tab)
  • New block paving, railings and planting outside apartments at Acton Gardens

    Residential, urban redevelopment

    Acton Gardens, Ealing

    209 apartments

    Existing housing redeveloped into 209 new apartments in the London Borough of Ealing: the detailed design of an urban SuDS scheme, and the streetworks agreed with the Highways Authority under a Section 278 Agreement.

    Read the project about Acton Gardens (opens in a new tab)
  • A wide, levelled earthworks platform under a grey sky at the Blakenham Glasshouses site

    Commercial

    The Blakenham Glasshouses

    200,000 m³ of earthworks

    Platforms for around 14 ha under glass, with the corridor for the East Anglian offshore power cables brought to final levels early, innovative drainage, and Section 278 approval for the site access.

    Read the project about the Blakenham Glasshouses (opens in a new tab)
  • Site dumpers and a newly laid kerb line on the levelled floor of the former chalk quarry at Needham Market

    Residential

    Former Needham Market Chalk Quarry

    140,000 m³ of earthworks

    A worked-out quarry with a deep lake and fill 13 m deep: we designed the earthworks in 3D to fill, regrade, settle and stabilise it into a usable platform, and negotiated drainage sensitive to the water table with the Environment Agency.

    Read the project about Needham Market (opens in a new tab)
  • The site entrance at Thetford Road, Watton: new homes, flags and a freshly surfaced estate road

    Residential

    Thetford Road, Watton

    110 homes

    Soakaways in the north, where the geology allowed. In the south, where groundwater ruled them out, a traditional network to the existing ditches, modified to give very economic attenuation.

    Read the project about Thetford Road, Watton (opens in a new tab)

Schools, New-Build and Extended

Our school work includes input at St Benedict’s Catholic School and St Edmund’s Catholic Primary School, Bury St Edmunds; St Joseph’s School, Ipswich; Derwent Lower School, Henlow; Monk’s Walk School, Welwyn Garden City; Beaumont School, St Albans; Broomfield Primary School, Chelmsford; Finborough School, Suffolk; and Sandy Secondary School, Bedfordshire.

See all our projects (opens in a new tab)

How we work

Why Developers Bring Us In Early

Determining the right drainage strategy at inception can be critical to judging what a site costs and whether it works.

  • In From the Start

    We particularly value early involvement: access and drainage strategies set early and carried through the project, saving time and cost.

  • Economical by Design

    Compliance with policy is critical, and so is an efficient, economical design: both decide whether a scheme is viable.

  • An Extension of Your Team

    Clients tell us one of our key strengths is our commitment to long-term relationships and continuity. Many of our projects run for years and have multi-million pound values.

  • Approvals and Adoption

    A comprehensive understanding of current policy and standards helps achieve planning approvals, and good working relationships with local authorities help secure adoption.

Richard Wigzell

If drainage for the developed site can be designed in such a way as to mimic the existing as closely as possible in all ways, then there will be minimal drainage impact from the development.

Richard Wigzell, then Director and now Senior Consultant, writing on SuDS in Professional Housebuilder & Property Developer, November 2017

Read the article (PDF, opens in a new tab)

The team

Owned and Run by Its Engineers

Ingent has traded under its name since 2017, and its roots in the region go back to 2004. Since a management buy-out in September 2023 it has been owned and run by its three working directors, who have more than forty years’ service with the firm between them. Twenty-four people work across our two offices.

  • Kieran Kincaid

    Kieran Kincaid

    Owner and Director MEng (Hons) CEng MICE MCIHT

    A Chartered Civil Engineer with over 20 years’ experience, Kieran leads the Bury St Edmunds office he established in 2018.

  • Matt Spencer

    Matt Spencer

    Owner and Director BSc (Hons) GMICE MCIHT

    With nineteen years’ engineering experience, Matt manages infrastructure design for developments across East Anglia, from strategy to delivery.

  • Daniel West

    Daniel West

    Owner and Director BSc (Hons) IEng MICE

    An Incorporated Engineer with 25 years of experience, Dan specialises in highway and drainage design, Flood Risk Assessments and drainage strategies.

  • Richard Wigzell

    Richard WigzellSenior Consultant, BSc (Hons) CEng MICE MIHT. Managing Director from the practice’s formation until the 2023 buy-out.

  • Adam Shelcot

    Adam ShelcotPrincipal Engineer, BSc (Hons) MIHE MCIHT. A drainage and highways specialist.

  • Sarah Orr

    Sarah OrrOffice Administrator. Recruitment, HR, and health and safety.

Jack Leeks in a white Ingent hard hat and orange high-visibility vest

Training the Next Engineers

Degree apprenticeships with Anglia Ruskin University and Suffolk New College, with tuition fees met by Ingent in partnership with the Government.

The degree apprenticeship scheme has allowed me to be part of the Engineering team who are encouraging and supporting me through the process, where I will have the opportunity to become an Incorporated Engineer and Member of the ICE at the end of the programme

Jack Leeks, Project Engineer Apprentice
Careers and apprenticeships (opens in a new tab)

Asked and answered

Questions Developers Ask Us

Something else on your mind? Call us on 01473 598038.

Will you work with the rest of our design team?

Yes. Assembling the right design team to take a development through planning can be crucial, and we are proud to have been part of many such successful collaborations, alongside architects, planning consultants and contractors.

When is the best time to involve you?

Ideally before you buy. Identifying cost and programme issues is key to buying and selling land well, and economical engineering input can be crucial in placing the correct value on it. From there, the access and drainage strategy carries through the life of the project.

Do you deal with the highway authority and the water company for us?

Yes. We have worked with many of the Highways Authorities across the country on Section 38 Agreements for on-site roads, Section 278 Agreements for off-site works, Minor Works and Temporary Site Access Agreements, and Technical Approval. On drainage we design sewers for adoption under Section 104, and we prepare Flood Risk Assessments liaising closely with the relevant governing bodies.

How small a site do you take on?

Single plots upwards. We work for clients from single-plot developers to national housebuilders, on greenfield and urban sites, and on schools and commercial projects.

Which flood risks does your assessment cover?

All the likely issues: fluvial, tidal, groundwater and surface water flooding, existing sewers and infrastructure failure, to satisfy National Planning Practice Guidance and the Planning Authority. Updates to the National Planning Policy Framework have increased the focus on surface water flooding as well as fluvial, and we advise on what that means for your site.

Do you support contractors once work starts?

Yes. Planning permissions often require the appointed contractor to produce a Construction Surface Water Management Plan, and we provide support and design for those plans. We can also carry out condition surveys and inspections of on-site road construction where required.

Where do you work?

From our offices in Claydon, near Ipswich, and Bury St Edmunds we design schemes across East Anglia, the South East and the Midlands, with projects as far afield as Acton Gardens in the London Borough of Ealing and Micklewell Park near Daventry.

Tell Us About Your Site

Where it is, the stage it has reached and what you need from us. We will come back to you for an initial chat.

The location, the number of homes or the floor area, and what you need.