Civil and infrastructure engineers, Suffolk
The Engineering That Makes a Development Work.
Highways, drainage, SuDS and flood risk design for developers and housebuilders, from the first appraisal to adoption, across East Anglia, the South East and the Midlands.
- 1,200 homesat White House Farm, Sprowston: we designed the infrastructure
- 200,000 m³of earthworks designed for the Blakenham Glasshouses
- S38, S278, S104the agreements that get roads and sewers adopted
- 24 peoplein two offices, Claydon and Bury St Edmunds

What we do
Five Services, Separately or as a Package
Bring us in for a single Flood Risk Assessment, or for all five as a site moves from purchase to adoption.
-
Pre-Planning
Pre-purchase and planning assessments that find the cost and programme issues before land changes hands, so the price reflects the engineering.
- For landowners through to major national residential developers
- Access and drainage strategy set from the start
- Earthworks designed and quantified in 3D
-
Flood Risk Assessments
Flood Risk Assessments for sites of every size, to satisfy National Planning Practice Guidance and the Planning Authority.
- Fluvial, tidal, surface water and groundwater flooding, existing sewers and infrastructure failure
- Practical, economical ways to limit the impact downstream
- For Veolia’s new waste transfer building at Costessey, how planning conditions would be met and flood risk handled
-
Drainage Design
From a few homes on private drainage to large residential sites with sewers designed for adoption, in the latest drainage software.
- Section 104 sewer designs for adoption
- Site inspections and a realistic strategy at inception
- Designs that meet the ever-expanding policy of Planning and Building Regulations
-
Sustainable Drainage Systems
SuDS that control runoff rates and volumes, clean the water and add amenity and biodiversity. Built in from inception, they can be very economical.
- Permeable paving, wet and dry swales, infiltration and detention ponds
- Management and maintenance schemes for construction and the life of the development
- Construction Surface Water Management Plans for contractors
-
Roads & Highways
Highway design for every type of carriageway, from a simple crossover agreement to major interchange improvements.
- Section 38 and Section 278 Agreements, Technical Approval
- Minor Works and Temporary Site Access Agreements
- Condition surveys and inspections of on-site road construction
How a site comes through
From Field to Adoption
From a field with a red line round it to roads and sewers adopted by the authorities: step an illustrative site through the four stages, with one of our schemes at each.
Stage 1 of 4
Before You Buy
We look at how the land falls, how the site can be reached from the road and where its water can go, so cost and programme issues show up before the land changes hands.
- The red line boundary
- Contours: how the land falls
- A possible access from the road
- A possible outfall to the watercourse

Micklewell Park, Daventry
A 38 ha greenfield site, for the vendor. Buyers had struggled to picture the earthworks on its rolling, sometimes steep land, so we designed and quantified them in 3D, removing risk and adding value.
Read the project about Micklewell Park (opens in a new tab)Stage 2 of 4
Through Planning
A Flood Risk Assessment to National Planning Practice Guidance, with the drainage and highway strategy that supports the planning application.
- Flood risk along the watercourse
- Surface water routes
- An attenuation basin at the low point
- The site access junction

Orchards Green, Ely, Parcels A & B
198 homes. Our drainage strategy re-profiles and widens the existing ditches to hold the run-off from a 1 in 100 year storm plus 40% for climate change, released at greenfield rates through multiple flow controls.
Read the project about Orchards Green (opens in a new tab)Stage 3 of 4
Ready to Build
Fully detailed groundworks design packs: the roads, sewers and SuDS a groundworks contractor builds from.
- Estate roads and plots
- Surface water sewers and manholes
- A flow control chamber and outfall
- Permeable paving on private drives

Rayne Road, Braintree
127 homes on an extremely steep site crossed by large Anglian Water sewers: adoptable roads at the maximum allowable gradients, a flow control chamber and two attenuation basins for a 1 in 100 year storm plus 40% for climate change.
Read the project about Rayne Road (opens in a new tab)Stage 4 of 4
To Adoption
Section 38, 278 and 104 agreements, Technical Approval and inspections of on-site road construction, with the Highway Authority at every stage.
- Roads for adoption under Section 38
- Sewers for adoption under Section 104
- Works on the existing road under Section 278

Woods Lane, Melton, for Bloor Homes
180 homes. The site access works brought a ghost right turn lane, a Toucan crossing and upgraded footways, all delivered under a Section 278 Agreement with the Highway Authority.
Read the project about Woods Lane (opens in a new tab)The form will note the stage you chose.
Selected projects
From Single Plots to 1,200 Homes
Housing estates and urban redevelopment, a filled chalk quarry and around 14 hectares under glass.
-

Residential
White House Farm, Sprowston
1,200 homes
For a consortium of developers: new highway and drainage infrastructure, diversion of strategic Water Authority apparatus, watercourse culverting and off-site cycleway upgrades, through two phases of infrastructure construction.
Read the project about White House Farm (opens in a new tab) -

Residential
Kingsfleet, Thetford
343 units
The first phase of the 5,000-home community at Kingsfleet, for Hopkins Homes: SuDS drainage and highway infrastructure, bus and cycle routes, and strategic infrastructure for the phases that follow.
Read the project about Kingsfleet (opens in a new tab) -

Residential, urban redevelopment
Acton Gardens, Ealing
209 apartments
Existing housing redeveloped into 209 new apartments in the London Borough of Ealing: the detailed design of an urban SuDS scheme, and the streetworks agreed with the Highways Authority under a Section 278 Agreement.
Read the project about Acton Gardens (opens in a new tab) -

Commercial
The Blakenham Glasshouses
200,000 m³ of earthworks
Platforms for around 14 ha under glass, with the corridor for the East Anglian offshore power cables brought to final levels early, innovative drainage, and Section 278 approval for the site access.
Read the project about the Blakenham Glasshouses (opens in a new tab) -

Residential
Former Needham Market Chalk Quarry
140,000 m³ of earthworks
A worked-out quarry with a deep lake and fill 13 m deep: we designed the earthworks in 3D to fill, regrade, settle and stabilise it into a usable platform, and negotiated drainage sensitive to the water table with the Environment Agency.
Read the project about Needham Market (opens in a new tab) -

Residential
Thetford Road, Watton
110 homes
Soakaways in the north, where the geology allowed. In the south, where groundwater ruled them out, a traditional network to the existing ditches, modified to give very economic attenuation.
Read the project about Thetford Road, Watton (opens in a new tab)
Schools, New-Build and Extended
Our school work includes input at St Benedict’s Catholic School and St Edmund’s Catholic Primary School, Bury St Edmunds; St Joseph’s School, Ipswich; Derwent Lower School, Henlow; Monk’s Walk School, Welwyn Garden City; Beaumont School, St Albans; Broomfield Primary School, Chelmsford; Finborough School, Suffolk; and Sandy Secondary School, Bedfordshire.
See all our projects (opens in a new tab)How we work
Why Developers Bring Us In Early
Determining the right drainage strategy at inception can be critical to judging what a site costs and whether it works.
In From the Start
We particularly value early involvement: access and drainage strategies set early and carried through the project, saving time and cost.
Economical by Design
Compliance with policy is critical, and so is an efficient, economical design: both decide whether a scheme is viable.
An Extension of Your Team
Clients tell us one of our key strengths is our commitment to long-term relationships and continuity. Many of our projects run for years and have multi-million pound values.
Approvals and Adoption
A comprehensive understanding of current policy and standards helps achieve planning approvals, and good working relationships with local authorities help secure adoption.

If drainage for the developed site can be designed in such a way as to mimic the existing as closely as possible in all ways, then there will be minimal drainage impact from the development.
Richard Wigzell, then Director and now Senior Consultant, writing on SuDS in Professional Housebuilder & Property Developer, November 2017
Read the article (PDF, opens in a new tab)The team
Owned and Run by Its Engineers
Ingent has traded under its name since 2017, and its roots in the region go back to 2004. Since a management buy-out in September 2023 it has been owned and run by its three working directors, who have more than forty years’ service with the firm between them. Twenty-four people work across our two offices.
-

Kieran Kincaid
Owner and Director MEng (Hons) CEng MICE MCIHT
A Chartered Civil Engineer with over 20 years’ experience, Kieran leads the Bury St Edmunds office he established in 2018.
-

Matt Spencer
Owner and Director BSc (Hons) GMICE MCIHT
With nineteen years’ engineering experience, Matt manages infrastructure design for developments across East Anglia, from strategy to delivery.
-

Daniel West
Owner and Director BSc (Hons) IEng MICE
An Incorporated Engineer with 25 years of experience, Dan specialises in highway and drainage design, Flood Risk Assessments and drainage strategies.

Richard WigzellSenior Consultant, BSc (Hons) CEng MICE MIHT. Managing Director from the practice’s formation until the 2023 buy-out.

Adam ShelcotPrincipal Engineer, BSc (Hons) MIHE MCIHT. A drainage and highways specialist.

Sarah OrrOffice Administrator. Recruitment, HR, and health and safety.

Training the Next Engineers
Degree apprenticeships with Anglia Ruskin University and Suffolk New College, with tuition fees met by Ingent in partnership with the Government.
The degree apprenticeship scheme has allowed me to be part of the Engineering team who are encouraging and supporting me through the process, where I will have the opportunity to become an Incorporated Engineer and Member of the ICE at the end of the programme
Asked and answered
Questions Developers Ask Us
Something else on your mind? Call us on 01473 598038.
Will you work with the rest of our design team?
Yes. Assembling the right design team to take a development through planning can be crucial, and we are proud to have been part of many such successful collaborations, alongside architects, planning consultants and contractors.
When is the best time to involve you?
Ideally before you buy. Identifying cost and programme issues is key to buying and selling land well, and economical engineering input can be crucial in placing the correct value on it. From there, the access and drainage strategy carries through the life of the project.
Do you deal with the highway authority and the water company for us?
Yes. We have worked with many of the Highways Authorities across the country on Section 38 Agreements for on-site roads, Section 278 Agreements for off-site works, Minor Works and Temporary Site Access Agreements, and Technical Approval. On drainage we design sewers for adoption under Section 104, and we prepare Flood Risk Assessments liaising closely with the relevant governing bodies.
How small a site do you take on?
Single plots upwards. We work for clients from single-plot developers to national housebuilders, on greenfield and urban sites, and on schools and commercial projects.
Which flood risks does your assessment cover?
All the likely issues: fluvial, tidal, groundwater and surface water flooding, existing sewers and infrastructure failure, to satisfy National Planning Practice Guidance and the Planning Authority. Updates to the National Planning Policy Framework have increased the focus on surface water flooding as well as fluvial, and we advise on what that means for your site.
Do you support contractors once work starts?
Yes. Planning permissions often require the appointed contractor to produce a Construction Surface Water Management Plan, and we provide support and design for those plans. We can also carry out condition surveys and inspections of on-site road construction where required.
Where do you work?
From our offices in Claydon, near Ipswich, and Bury St Edmunds we design schemes across East Anglia, the South East and the Midlands, with projects as far afield as Acton Gardens in the London Borough of Ealing and Micklewell Park near Daventry.
Contact
Prefer to talk it through? Call the office nearest your site, or email us.
-
Claydon, near Ipswich
Unit 8 Opus Park, Exchange Place, Old Ipswich Road, Claydon, Suffolk IP6 0FU
-
Bury St Edmunds
1a Greenwood Court, Skyliner Way, Bury St Edmunds, Suffolk IP32 7GY