The whole site
Eight trades. One programme.
Everything on this drawing is work we carry out or manage ourselves as principal contractor, from the supply in the substation to the coffee machine in the shop.
Try it: choose a part, or tap a number on the drawing.
Part 1 of 8
Power and grid connection
New supplies, substations, LV cabinets, and the ducts and cables to every pump and charger. Our sister company Broham Energy is an independent connection provider, so the connection itself can be designed and built inside the group, up to 132kV.
On site: MFG Stretford: a new substation, LV cabinet and power packs for eight ultra-rapid bays.
Part 2 of 8
Decommissioning and remediation
Old fuel systems made safe and taken out: tanks, lines and structures. Asbestos surveys and removal, contaminated ground, and the notices your Petroleum Enforcement Authority needs before work starts.
On site: Asda Nuneaton: 1960s tanks out, asbestos removed, dye-works ground and knotweed cleared.
Part 3 of 8
Civils, drainage and surfacing
Our in-house civils team lays the drainage, interceptors, separators and attenuation tanks, the ducts and kerbs, and the forecourt slab itself, finished to a standard you can see.
On site: BP Braintree: a 105m³ attenuation tank with a flow control at 3 litres a second.
Part 4 of 8
Tanks and fuel pipework
Excavations and temporary works, tank bases and ballast, new storage tanks and the pipework that feeds every hose, laid out to the flow rate you need.
On site: Asda Sutton-in-Ashfield: pipework designed for at least 40 litres a minute at every nozzle.
Part 5 of 8
Canopy and signage
Canopy foundations, steelwork, decks, fascias and lighting, and the price sign at the roadside.
On site: BP Foley: a canopy built as a Faraday cage, under overhead high-voltage lines.
Part 6 of 8
Pumps and islands
Islands, dispensers and HGV lanes, pay at pump, LPG and hydrogen, installed, tested and commissioned.
On site: Asda Longwell Green: a fully automated eight-pump filling station.
Part 7 of 8
EV charging hub
Ultra-rapid bays with their power, canopy, markings and protection, beside the fuel or in place of it.
On site: Speke, Liverpool: a fuel and EV site for A+F Group, with a 10-bay, 350kW hub for Source EV.
Part 8 of 8
Shop, food-to-go and wash
Sales buildings, extensions and fit-outs, drive-thrus for coffee and food brands, car washes, jet wash bays and valeting.
On site: Costa Selby: a new drive-thru, handed over in 18 weeks, on time and on budget.