Four steel fixers in orange overalls tying the reinforcement of a long strip foundation at Sizewell C, under a cloudy sky
Steel fixing for the BFW warehouse foundations, Sizewell C, 2026

For main contractors and housebuilders

Groundworks, Civils and Concrete Frames, From the Ground Up.

Piled foundations, deep drainage, roads and Section 278 works, and reinforced concrete frames, delivered by our own retained teams from our head office in Old Knebworth, Hertfordshire.

  • Over 30 yearsof experience across five sectors
  • ISO 9001, 14001, 45001certified to September 2027
  • SSIP: Once For AllHealth & Safety, to September 2027
  • Constructionline Goldcertificate issued October 2026

Clients include

  • Bowmer & Kirkland
  • Goldbeck
  • VolkerFitzpatrick
  • Bellway
  • Taylor Wimpey
  • McCarthy & Stone
  • Vistry
  • Telford Homes
  • REDS10
  • McLaren Construction

What we do

Three Core Skills, Start to Finish

We combine all three, as principal contractor where appropriate and preferably within a partnering framework, from the first site visit to the final execution of the work.

  • Black ground beam formwork laid out across a cleared plot, two workers setting it out, and three dumpers marked AD Bly behind

    Ground Works

    Sound and solid foundations, from site clearance to the finished external works, with our own carpenters and steel fixers.

    • Decontamination and site clearance
    • Piling, foundations and substructures
    • Drainage
    • External works and paving
    Ground works in detail
  • Aerial view of the new roundabout on the A505 at Royston, with a lorry and cars passing and open fields beyond

    Civil Engineering

    Skilled labour, plant and materials for infrastructure and ground remodelling, working with local authorities, utility providers and the Environment Agency.

    • Major infrastructure roads and sewers
    • Bridge works and pumping stations
    • Balancing ponds, ditches and swales
    • Thrust boring, headings and ground remodelling
    Civil engineering in detail
  • A reinforced concrete deck under construction in West Drayton, with a tower crane, edge protection and apartment blocks behind

    Concrete Frames

    Reinforced in-situ concrete by our own steel fixing and carpentry teams, supervised by time-served supervisors.

    • Reinforced in-situ concrete frames
    • Multi-storey, shell and core construction
    • Transfer slabs and retaining walls
    • Basements and undercroft parking
    Concrete frames in detail

Our work, layer by layer

What Goes in the Ground

Choose a layer to see what we build there, and one of our projects where we did it.

Cross-section of a site, drawn to explain our work, not to scale On the left, a road with a kerb, a manhole, a drainage run and an attenuation tank below it. In the middle, a reinforced concrete frame of three floors over a basement car park, held by sheet piles, on piles with pile caps. On the right, a retaining wall with soil nails holding a higher bank, with the line of the original ground dashed above the cut. A dashed water table runs through the clay above the chalk. Highlighted now: 1, earthworks: the cut and fill between the original ground and the new levels.
Drawn to explain our work, not to scale.

15,000 m³

bulk excavation for Bentley Motors’ new design offices in Crewe

Earthworks, Cut and Fill

Site strip and clearance, decontamination and the removal of invasive species, then cut and engineered fill to formation level, with GPS-guided plant on jobs such as Bognor Regis and Crawley.

Client
Goldbeck
Programme
March 2020 to June 2021
Value
£1.8M
Bentley Motors, Crewe

1,400

reinforced pile caps under the suspended ground floor of a 13,000 m² distribution unit at Stanford-le-Hope

Piles, Pile Caps and Ground Beams

Precast or in-situ concrete piles, CFA, helical or driven, with in-situ capping beams, and reinforced or precast ground beams formed by our own specialist carpenters and steel fixers.

Client
Goldbeck Construction
Programme
January to July 2023
Value
£2.4m
Distribution unit, Stanford-le-Hope

9.5 m

deep caisson shafts, 3 m across, for the pump station of a new retail park at Bognor Regis

Drainage, Pumping and Attenuation

New and replacement drainage in new or existing carriageways, soakaways, tanks and interceptors, pumping stations and sewer diversions, with balancing ponds and swales for sustainable drainage.

Client
RG Group, for Landlink
Programme
August 2020 to June 2021
Value
£6.0m
Retail park, Bognor Regis

4,600 m²

basement car park under ten multi-storey, reinforced concrete framed apartment blocks in West Drayton

Basements and Concrete Frames

Sheet-piled excavations with their temporary works, then reinforced in-situ concrete basements, podium decks, cores and frames, built by our own steel fixing and carpentry teams.

Client
Redrow Homes
Programme
August 2016 to June 2019
Value
£22.8M
Apartment blocks, West Drayton

Sizewell B

a new loop access road inside the live, operating nuclear power station, releasing land for Sizewell C

Roads, Sewers and Highway Works

Roads and sewers, Section 278 highway works, bellmouths, junctions and roundabouts, kerbs, street lighting and ducting, built around live traffic and live services.

Client
Imtech / Dalkia
Programme
September 2022 to November 2023
Value
£1.8m
Access road, Sizewell B
Discuss a Project

The form will note the layer you chose.

Projects

Finished Work, With the Numbers

Six recent projects, with the scope, programme and value as our project pages record them.

  • Three steel fixers in a deep trench of reinforcement, with bars lowered from a crane and red edge barriers around it

    Commercial

    BFW Warehouse, Sizewell C

    Heavily reinforced strip foundations: 1,300 m³ of ready-mixed concrete placed in four pours with a bespoke formwork system, on a six-week programme.

    Client
    VolkerFitzpatrick
    Programme
    April to May 2026
    Value
    £555k
  • Aerial view of the MSCP7 site at Gatwick Airport, with a crawler crane, the new structure rising and a road alongside

    Commercial

    MSCP7, Gatwick Airport

    Our package for a 3,200-space car park over seven floors at the North Terminal: sheet pile retaining walls, pile caps, ground beams, and five stair cores and four lift shafts in waterproof concrete.

    Client
    Goldbeck
    Programme
    April 2023 to June 2024
    Value
    £2.65m
  • Aerial view of a four-storey retirement block in Eastbourne, with gardens, terraces and a block-paved car park in the foreground

    Residential

    Retirement Living, Eastbourne

    Completed in September 2026, metres from the English Channel: a drainage strategy reworked for a high water table, a permeable SUDS car park with 41 spaces and a new UKPN substation.

    Client
    McCarthy & Stone
    Programme
    February 2025 to September 2026
    Value
    £875k
  • New concrete house slabs set out across a cleared site at Bramford, with electricity pylons on the skyline

    Residential

    Lockwood Place, Bramford

    190 homes: deep drainage and a foul pumping station built with dewatering for a high water table, Section 278 works under live 400 kV power lines, and chalk dissolutions treated with high-pressure grouting.

    Client
    Bellway Essex
    Programme
    November 2021 to June 2025
    Value
    £10.3m
  • New stone paving and bollards outside a brick building with arched windows at Stratford, behind site hoarding

    Infrastructure

    International Way, Stratford

    Section 278 works and the station expansion zones, delivered in six phases while keeping access to the DLR and the International station open, with bus access built to TfL specification.

    Client
    Telford Homes
    Programme
    April 2025 to January 2026
    Value
    £1.2m
  • New steps with handrails rising through planted banks beside a block-paved path at Claverham College

    Education

    Claverham College, Battle

    A replacement school on a sloping site beside a live school and leisure centre: deep pad foundations, precast retaining walls, two off-site drainage connections, and new steps, railings and landscaping.

    Client
    Bowmer & Kirkland
    Programme
    April 2022 to December 2023
    Value
    £2.1m

On Site Now

  • Sizewell C, HBT and HAZ 6VolkerFitzpatrick
  • Stratford WaterfrontBallymore Group
  • Loxford HouseMount Anvil
  • Kettering General Hospital MSCPGoldbeck
  • Highams Park SchoolBowmer & Kirkland
  • ShoeburynessBellway Homes Essex
  • RAF Marham, King’s LynnREDS10
  • Tyndale HouseBarnes Construction

Every current siteAll our projects

Our people

Our Own People, at Every Level

With retained staff at all levels and across every discipline, we avoid the pitfalls of subcontracting. We have built a team with the skills, experience and commitment to do an excellent job.

  • In-House Trades

    Our own carpenters and steel fixers form the reinforced concrete under time-served supervisors, with our plant co-ordinators, workshop, transport manager and CAD and GPS team behind them.

  • Trained to Industry Standards

    We have invested heavily in training staff at every level. In 2026 our teams took part in CPD events with Trimble, Propellor and National Trench Safety.

  • The Next Generation

    In November 2026 Bowmer & Kirkland recognised us as a Bronze T-Level Supplier, after we took on T-Level students at Highams Park and Laureate Academy.

Two people holding the T-Level Excellence Supplier Award certificate in front of an AD Bly Construction sign
The T-Level Excellence Supplier Award from Bowmer & Kirkland, November 2026.
Jack Randall in his graduation cap and gown

“I’m really grateful to ADBLY for giving me the opportunity to complete my degree at the University of Westminster over the past five years while working four days a week alongside my studies.”

Jack Randall Surveyor, on his BSc (Hons) in Quantity Surveying and Commercial Management

The Leadership Team

Each of our directors takes direct responsibility for specific parts of the business.

  • Aaron McSkimmingManaging Director
  • Paul HelliarOperations Director
  • Stuart HirstCommercial Director
  • Mark ThompsonConstruction Director
  • Tom SargentEnvironment, Health and Safety Director
  • Kevin McSkimmingProcurement Director
  • Deena JenkinsFinance Director
  • Sara LawrenceHuman Resources Manager

Accreditations

Certified, With the Dates on Show

Our ISO certificates are issued by Allied Certification Services, and our first ISO 9001 registration dates from 11 September 2009.

Download our certificates
  • ISO 9001:2015

    Quality management. Certificate 001829/2026, valid to 10 September 2027.

  • ISO 14001:2015

    Environmental management. Certificate 001830/2026, valid to 10 September 2027.

  • ISO 45001:2018

    Occupational health and safety. Certificate 001831/2026, valid to 10 September 2027.

  • Once For All Health & Safety

    SSIP. Registration 00358040, valid to 8 September 2027.

  • Constructionline

    Gold Member 00358040. Certificate issued 9 October 2026.

Questions

What Contractors Ask Us First

Which areas do you work in?

We typically work across Buckinghamshire, Cheshire, Essex, Hertfordshire, Kent, Lincolnshire, London, Middlesex, Norfolk, Northamptonshire, Suffolk, Sussex and the West Midlands, from our head office at Nup End Business Centre, Old Knebworth.

Can you act as principal contractor?

Yes, where it is appropriate. We took the principal contractor role on the infrastructure works at High Leigh Garden Village in Hoddesdon for Taylor Wimpey, at Poppy View in Saffron Walden for Bellway Essex, and at Garrison Point in Shoeburyness for Bellway Homes Essex.

Do you subcontract the work?

With retained staff at all levels and across every discipline, we avoid the pitfalls of subcontracting. In-situ concrete is carried out by our own specialist steel fixing and carpentry teams, supervised by time-served supervisors.

Can you work on live sites?

Yes. Recent work includes live schools for Bowmer & Kirkland, a scheme on a live hospital site in Enfield, live highways depots for STP Solutions, the Amazon distribution centre at Tilbury, where we worked around shift patterns in a 24-hour live environment, and a new access road inside the operating Sizewell B nuclear power station.

Do you carry out Section 278 highway works?

Yes. Our civil engineering works are compliant with Section 278 of the Highways Act 1980, from new bellmouths and junctions to the new roundabout on the A505 at Royston and highway works with TfL at Stratford.

Which accreditations do you hold?

ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018, each valid to 10 September 2027, Once For All Health & Safety (SSIP) to 8 September 2027, and Constructionline Gold. Every certificate is on our accreditations page.

How do we send an enquiry or a tender?

Use the form below or call 01438 821779. Tell us the site, the scope, the programme and any tender dates, and a member of the team will be in touch shortly.

Talk to us

Talk to Us About Your Next Project

Send us the site, the scope and the programme, and a member of the team will be in touch shortly.

Site location, scope, programme and any tender dates.

We use your details only to reply to your enquiry, and never share or sell them. Our privacy policy explains how we handle them.

Or Call the Office