Aardvarc Electrical Engineers, Hebburn. Since 2006.

High Voltage Engineers for the Whole Life of a Substation.

Design, installation, commissioning, maintenance, switchgear retrofit and strip-out for power stations, wind farms, utilities and industry, anywhere in the UK. Formed in 2006 by engineers from the high voltage industry, with a 24hr call out for urgent maintenance.

  • 2006Formed by high voltage engineers
  • 400 kVMaintenance from low voltage up
  • 24hrCall out for urgent maintenance
An engineer in Aardvarc hi-vis, seen from behind, reaching up to the controls of a substation panel
An Aardvarc engineer at a substation control panel

Our services, stage by stage

From the First Drawing to the Last Bolt Out

We work as an EPC contractor across the whole life of high voltage plant: consultancy and design, procurement, installation, commissioning and maintenance, and strip-out and demolition when apparatus reaches the end of its journey. Choose a stage to see what we do there.

  1. An engineer marking up electrical drawings at a desk, with a calculator and an Aardvarc folder

    Technical and Design

    Our chartered engineers provide full design services from low voltage to extra high voltage systems, with the consultancy and technical support that large electrical installations need.

    • System studies of your network under fault conditions, with protection curves, fault level and load flow diagrams, power system models and recommendations for corrective action
    • Load assessment: we monitor your site loads to check available capacity and any overload potential
    • Feasibility studies for remote control and automation, to isolate faults and restore supplies more quickly
    • Power factor correction, and plug in connectors to connect a generator to your low voltage network

    On our record At Wavetree we designed and installed the 33 kV switchgear, including 132 kV modification works.

  2. An engineer on a mobile platform installing disconnectors beside a new green transformer

    Installation and Commissioning

    From specification and purchase to project management, installation, commissioning and testing of electrical plant at all voltage ranges, with CDM and total attention to safety throughout.

    • Independent project management, and close working help with specification and purchasing
    • Quality installation and assembly under reliable, competent site supervision
    • Efficient high voltage commissioning and testing
    • Operations, management and asset records prepared for handover

    On our record New build 66 kV and 132 kV substations at Penny Hill Windfarm and Stublach, Cheshire, where we carried out all the M&E works.

  3. A gloved hand on the controls of a substation panel lined with indicator lamps and switches

    Maintenance

    A full suite of operational, high voltage maintenance and repair services covering all voltages from low voltage to 400 kV, anywhere in the UK, backed by our 24hr call out.

    • Operational and maintenance contracts, with regular preventive maintenance and testing to minimise breakdowns
    • Maintenance only contracts, under our own safety system or your preferred one
    • System inspections of your network, its asset condition and any remedial works needed
    • Rapid response contracts, health and safety management and rope access

    On our record Rope access capability, used on some of our HV and LV customer maintenance contracts.

  4. A long row of older grey switchgear and control panels in a switch room

    Switchgear Retrofit

    Every retrofit needs its own response. We work closely with you so the process is safe, smooth, efficient and cost effective, and we can bring existing switchgear up to current standards.

    • Retrofit of high voltage internal arc protection, to enhance existing switchgear and operator safety
    • Bespoke switchgear design and modifications, from design and manufacture to installation and commissioning
    • Voltage transformer and panel upgrades

    On our record Design, manufacture, installation and commissioning of modifications to bespoke 24 kV, 4000 A switchgear in the 402 Building at Alcan, now Lynemouth Power Station.

  5. A substation mid-demolition, with concrete gantries, rubble and an excavator

    Strip-Out and Demolition

    When equipment reaches the end of its journey, we strip out and dispose of it as competently as we build and maintain, whether it is part of a planned replacement or a strip-out and demolition contract on its own.

    • Safety is our number one priority, with thorough risk management and risk assessment
    • Complete, thorough documentation, with all relevant licences maintained
    • Waste managed effectively and responsibly
    • An SF6 gas service, from gas detection and repair to full gas removal

    On our record De-gassing, oil removal and civils demolition at Whitegate 132 kV substation, and 33 kV switchgear dismantled and recycled inside Snowdonia National Park.

Maintenance and rapid response

A 24hr Call Out When Your Plant Cannot Wait

Even the best maintained system can have problems, and they can happen quickly. Aardvarc provides 24-hour support with rapid response to any site for urgent maintenance, and rapid response contracts for networks that need one.

  • Operational and maintenance contracts customised to your site
  • Maintenance only contracts, under our safety system or yours
  • System inspections, with all relevant plant notifications provided

24hr Call Out

07852 361 000

For an urgent fault, call rather than email. For planned work, Discuss Your Project with us.

Selected projects from our case studies

Substations We Have Built, Kept Running and Cleared

All our case studies (opens in a new tab)

Testimonials

In Our Clients’ Own Words

I would like to commend Graham … I found the feedback and actions from their team to be excellent and fully aware of hazards … So well done Graham and any one else involved. Shows what can be achieved.

Bob HuntingdonLynemouth Power LTD

Many thanks for your help in resolving our problems with the VT and the upgrades to the panels, the job went like clockwork so we are stable for the first time in 2 years. Please pass on my thanks to the HV team, Craig, Joe, Carl & Paul… a great bunch of lads.

Bert BrownDu Pont Ltd

About Aardvarc

Engineers From the High Voltage Industry, Since 2006

Aardvarc was formed in 2006 by engineers from the high voltage industry to meet the changing needs of the electrical end user, specialising in medium to high voltage. From our base in Hebburn, we work on high voltage installations throughout the UK.

  • Chartered Engineers

    Full design services, from low voltage to extra high voltage systems.

  • Our Own Team

    M&E works on our new build substations carried out by our in-house team.

  • Safety First

    Safety is our number one priority, with CDM and thorough risk assessment.

  • Licensed and Documented

    All relevant licences maintained, and documentation complete and thorough.

Aardvarc vans parked outside a unit with Aardvarc signage
Vans from the Aardvarc fleet. You have to have the correct tools for the job.

Questions

What Clients Ask Us First

Something else? Call us on 07852 361 000 or Discuss Your Project online.

Do you have a 24-hour call out?

Yes. Our 24hr call out number is 07852 361 000. We provide 24-hour support with rapid response to any site for urgent maintenance, and if required our assistance can be available on a 24/7 basis to suit your needs.

What voltages do you work on?

Our maintenance and repair services cover all voltages from low voltage to 400 kV. Our chartered engineers design systems from low voltage to extra high voltage, and our case studies include 24 kV, 33 kV, 66 kV and 132 kV work.

Where in the UK do you work?

Anywhere in the UK. We are based in Hebburn, and our case studies run from a new 132 kV substation at Stublach in Cheshire to 33 kV switchgear dismantled inside Snowdonia National Park.

Can you work under our safety system?

Yes. Our maintenance only contracts can run under our own safety system or your preferred safety system.

Will you inspect our network before a maintenance contract?

Yes. We come to your site to inspect and evaluate your network, identify your current asset condition and any remedial works required, and provide all relevant plant notifications.

Can you remove old switchgear and transformers safely?

Yes, as part of a planned replacement or as a strip-out and demolition contract on its own. The work is done by experienced staff using thorough risk management and risk assessment, with complete documentation, all relevant licences maintained and waste managed responsibly. We also offer an SF6 gas service, from gas detection and repair to full gas removal.

Can you help us avoid reactive power charges?

Power factor correction capacitors cut electrical load and minimise wasted energy, improving plant efficiency, and can help you avoid the reactive power charge in your electricity bills. A site survey is all that is required to determine the type, size and design of system to suit your site.

Contact

Tell Us About Your Project

A new connection, a maintenance contract, a retrofit or a strip-out: send us the details and we will be in touch.

Discuss Your Project

Urgent fault? Call our 24hr call out on 07852 361 000 rather than using this form.

Your Project
What do you need?
Your Details

We will use your details to reply to your enquiry. Our privacy policy (opens in a new tab) explains how we handle them.

24hr Call Out

07852 361 000

Our Base

Unit 10, Victoria Industrial Estate, Victoria Road West, Hebburn NE31 1UB

Open in Google Maps (opens in a new tab)